MaintainX Asset Hub logo
EnterprisePricing
Wilo

Wilo Pump TOP-S25/7

Need answers fast?
Explore the manual using AI.

Wilo Pump TOP-S25/7
Wilo Pump TOP-S25/7

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Wilo Pump TOP-S25/7

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Wilo Pump TOP-S25/7

Wilo Pump TOP-S25/7

Create an account to install this asset package.

Maintenance Plans for Wilo Pump Model TOP-S25/7

Integrate maintenance plans directly into your work orders in MaintainX.

Motor Protection System Check

Check mark

Motor Protection System Verification

Check mark

Verify terminal box type and corresponding protection mechanism

Check mark

Is the thermal tripping setting corresponding to the maximum current of the speed stage?

Check mark

Is the Wilo tripping unit SK 602(N)/SK 622(N) present?

Check mark

Is the thermal winding contact (WSK) connected to a motor protection system?

Check mark

Reset Procedures

Check mark

Perform reset based on terminal box type

Run this procedureArrow right

Electrical Connection Check

Check mark

Pre-Work Safety Measures

Check mark

Ensure all poles of the power supply are disconnected before working on the pump

Check mark

Wait for 5 minutes before commencing work on the module (applies only to 1~ systems)

Check mark

Voltage and Connection Verification

Check mark

Check that all connections (including potential-free contacts) are voltage-free

Check mark

Is the module/terminal box undamaged?

Check mark

Does the current type and voltage of the mains connection correspond to the specifications on the rating plate?

Check mark

Connection and Cable Requirements

Check mark

Ensure the electrical connection is established via a fixed connection line with a connector device or an all-pole switch with a contact opening width of at least 3 mm

Run this procedureArrow right

Pump Maintenance

Check mark

8.1 Filling and Venting

Check mark

Switch off the pump

Check mark

Close the check valve on the pressure side

Check mark

Protect electrical parts from any escaping water

Check mark

Carefully open the venting screw using a suitable tool

Check mark

Is the necessary inlet pressure present at the suction side of the pump?

Check mark

Carefully push back the motor shaft with a screwdriver several times

Check mark

Wait for 15 to 30 seconds before screwing the venting screw back in

Check mark

Screw the venting screw back in

Run this procedureArrow right

Condensate Drain Check

Check mark

7.1 Installation / 7.1.3 Insulation

Check mark

Ensure the following protections are in place for the pump

Check mark

Check that condensate drain openings are clear and unobstructed

Check mark

Verify that insulation has not been applied beyond the motor separation joint

Run this procedureArrow right

Motor Maintenance

Check mark

9.1 Dismantling/installation of the motor

Check mark

Read the chapters 'Dismantling/installation of the motor' and 'Decommissioning' before maintenance

Check mark

Comply with safety instructions in chapters 2.6, 7, and 8

Check mark

Prepare the pump for dismantling

Check mark

Is the entire system drained if no check valves are fitted?

Check mark

Observe manufacturer's information and safety data sheets on possible additives

Check mark

Comply with national regulations for accident prevention to avoid injury from falling motor

Check mark

Ensure motor head is not held with the impeller facing downward during installation/dismantling

Check mark

Is the motor rotated to the desired position without complete removal if only the terminal box is repositioned?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Wilo

Explore Other Assets