MaintainX Asset Hub logo
EnterprisePricing
Wilo

Wilo Pump TOP-S25/13

Need answers fast?
Explore the manual using AI.

Wilo Pump TOP-S25/13
Wilo Pump TOP-S25/13

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Wilo Pump TOP-S25/13

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Wilo Pump TOP-S25/13

Wilo Pump TOP-S25/13

Create an account to install this asset package.

Maintenance Plans for Wilo Pump Model TOP-S25/13

Integrate maintenance plans directly into your work orders in MaintainX.

Thermal Insulation Shell Inspection

Check mark

7.1.3 Insulation of the pump in cooling/air-conditioning systems

Check mark

Verify that the two half-shells of the thermal insulation are correctly fitted

Check mark

Check that the guide pins are engaged in the opposite holes

Check mark

For cooling/air-conditioning systems, verify that commercially-available diffusion-proof thermal insulation materials are used instead of the supplied shells

Run this procedureArrow right

Pump Startup Check

Check mark

8 Commissioning

Check mark

Check that the pump was installed and connected correctly

Check mark

Ensure the sealing screw and flat gasket are in place

Check mark

Prime the unit correctly

Check mark

Verify that the pump rotor compartment is vented automatically

Check mark

Confirm that dry running for short periods is acceptable

Check mark

Ensure the motor head, differential pressure screw, and flange connection/threaded pipe union are not removed for venting

Run this procedureArrow right

Pump Leak Check

Check mark

7.1 Installation

Check mark

Check for leaks after installation

Check mark

Periodically verify all connections remain leak-free during operation

Check mark

Ensure leakages of hazardous fluids are removed to prevent danger to persons or the environment

Run this procedureArrow right

Rotation Direction Check

Check mark

8.2 Rotation direction monitoring

Check mark

Verify the following conditions for 3~ (three-phase) pumps

Check mark

Briefly switch the pump on to check the direction of rotation

Check mark

Is the direction of rotation correct?

Check mark

Ensure the motor's direction of rotation corresponds to the direction of rotation arrow on the rating plate

Check mark

If the direction of rotation is incorrect

Check mark

Electrically isolate the pump

Check mark

Interchange 2 phases in the terminal box

Check mark

Restart the pump

Run this procedureArrow right

Electrical Connection Check

Check mark

Pre-Work Safety Measures

Check mark

Ensure all poles of the power supply are disconnected before working on the pump

Check mark

Wait for 5 minutes before commencing work on the module (applies only to 1~ systems)

Check mark

Voltage and Connection Verification

Check mark

Check that all connections (including potential-free contacts) are voltage-free

Check mark

Verify that the current type and voltage of the mains connection correspond to the specifications on the rating plate

Check mark

Connection and Protection Measures

Check mark

Ensure the electrical connection is established via a fixed connection line with a connector device or an all-pole switch with a contact opening width of at least 3 mm

Check mark

Verify mains-side fuse protection is 10 A, slow

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Wilo

Explore Other Assets