MaintainX Asset Hub logo
EnterprisePricing
Wilo

Wilo Pump TOP-S80/10

Need answers fast?
Explore the manual using AI.

Wilo Pump TOP-S80/10
Wilo Pump TOP-S80/10

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Wilo Pump TOP-S80/10

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Wilo Pump TOP-S80/10

Wilo Pump TOP-S80/10

Create an account to install this asset package.

Maintenance Plans for Wilo Pump Model TOP-S80/10

Integrate maintenance plans directly into your work orders in MaintainX.

Rotation Direction Check

Check mark

8.2 Rotation direction monitoring

Check mark

Check the direction of rotation indicator light on the terminal box

Check mark

Is the indicator light green?

Check mark

If the light is not green, electrically isolate the pump and interchange 2 phases in the terminal box

Check mark

Restart the pump and check the direction of rotation again

Check mark

Verify that the motor's direction of rotation matches the arrow on the rating plate

Run this procedureArrow right

Pump Leak Check

Check mark

7.1 Installation

Check mark

Check for leaks after installation

Check mark

Periodically verify all connections remain leak-free during operation

Check mark

Describe any leakages of hazardous fluids and actions taken to remove them

Run this procedureArrow right

Electrical Connection Check

Check mark

7.2 Electrical connection

Check mark

Ensure the electrical connection is made by an approved electrician.

Check mark

Disconnect all poles of the power supply before working on the pump.

Check mark

Wait for 5 minutes before commencing work on the module (applies only to 1~ systems).

Check mark

Check that all connections are voltage-free.

Check mark

Is the module/terminal box undamaged?

Check mark

Verify that the current type and voltage correspond to the rating plate specifications.

Check mark

Ensure the electrical connection is via a fixed line with a connector device or an all-pole switch with a contact opening width of at least 3 mm.

Check mark

Check mains-side fuse protection is 10 A, slow.

Run this procedureArrow right

Motor Protection System Check

Check mark

Motor Protection System Verification

Check mark

Verify terminal box type and corresponding protection mechanism

Check mark

Is the thermal tripping setting corresponding to the maximum current of the speed stage?

Check mark

Is the Wilo tripping unit SK 602(N)/SK 622(N) present and connected?

Check mark

Is the thermal winding contact (WSK) connected to a motor protection system?

Check mark

Reset Procedures

Check mark

Perform reset based on terminal box type

Run this procedureArrow right

Condensate Drain Check

Check mark

7.1 Installation / 7.1.3 Insulation

Check mark

Verify the following conditions for outdoor installations and cooling/air-conditioning systems

Check mark

Check that condensate drain openings are clear and unobstructed

Check mark

Is the insulation applied correctly, not beyond the motor separation joint?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Wilo

Explore Other Assets