PDF MANUAL

Manual for Wilo Pump TOP-S65/7

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Wilo Pump TOP-S65/7

Wilo Pump TOP-S65/7

Create an account to install this asset package.

Maintenance Plans for Wilo Pump Model TOP-S65/7

Integrate maintenance plans directly into your work orders in MaintainX.

Frequency Converter Check

Check mark

Frequency converter operation

Check mark

Check the type of motor

Check mark

Verify the use of output filters

Check mark

Check the type of filter used

Check mark

Measure the rate of voltage rise (du/dt)

Check mark

Is the rate of voltage rise within the limit (du/dt < 500 V/μs)?

Check mark

Measure the voltage spikes (û)

Check mark

Are the voltage spikes within the limit (û < 650 V)?

Check mark

Measure the minimum voltage at connection terminals (Umin)

Run this procedureArrow right

Pump Maintenance

Check mark

8.1 Filling and Venting

Check mark

Switch off the pump

Check mark

Close the check valve on the pressure side

Check mark

Protect electrical parts from any escaping water

Check mark

Carefully open the venting screw using a suitable tool

Check mark

Carefully push back the motor shaft with a screwdriver several times

Check mark

Wait for 15 to 30 seconds before screwing the venting screw back in

Check mark

Screw the venting screw back in

Check mark

Switch on the pump

Run this procedureArrow right

Electrical Connection Check

Check mark

Pre-Work Safety Measures

Check mark

Ensure all poles of the power supply are disconnected before working on the pump

Check mark

Wait for 5 minutes before commencing work on the module (applies only to 1~ systems)

Check mark

Electrical Connection Verification

Check mark

Verify that all connections (including potential-free contacts) are voltage-free

Check mark

Is the module/terminal box undamaged?

Check mark

Does the current type and voltage of the mains connection correspond to the specifications on the rating plate?

Check mark

Connection Line and Fuse Protection

Check mark

Ensure the electrical connection is established via a fixed connection line with a connector device or an all-pole switch with a contact opening width of at least 3 mm

Run this procedureArrow right

Rotation Direction Check

Check mark

8.2 Rotation direction monitoring

Check mark

Verify the following conditions for three-phase pumps

Check mark

Is the direction of rotation light green when the pump is briefly switched on?

Check mark

If the direction of rotation is incorrect, was the pump electrically isolated and two phases interchanged in the terminal box before restarting?

Run this procedureArrow right

Thermal Insulation Shell Inspection

Check mark

7.1.3 Insulation of the pump in cooling/air-conditioning systems

Check mark

Verify the applicability of the insulation

Check mark

Check the usage of thermal insulation shells

Check mark

Verify the fitting of the thermal insulation half-shells

Check mark

Ensure guide pins are engaged in the opposite holes

Check mark

For cooling/air-conditioning systems, verify the use of diffusion-proof materials

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Wilo

Explore Other Assets