Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Wilo Pump TOP-S65/7
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Frequency Converter Check
Frequency converter operation
Check the type of motor
Verify the use of output filters
Check the type of filter used
Measure the rate of voltage rise (du/dt)
Is the rate of voltage rise within the limit (du/dt < 500 V/μs)?
Measure the voltage spikes (û)
Are the voltage spikes within the limit (û < 650 V)?
Measure the minimum voltage at connection terminals (Umin)
Pump Maintenance
8.1 Filling and Venting
Switch off the pump
Close the check valve on the pressure side
Protect electrical parts from any escaping water
Carefully open the venting screw using a suitable tool
Carefully push back the motor shaft with a screwdriver several times
Wait for 15 to 30 seconds before screwing the venting screw back in
Screw the venting screw back in
Switch on the pump
Electrical Connection Check
Pre-Work Safety Measures
Ensure all poles of the power supply are disconnected before working on the pump
Wait for 5 minutes before commencing work on the module (applies only to 1~ systems)
Electrical Connection Verification
Verify that all connections (including potential-free contacts) are voltage-free
Is the module/terminal box undamaged?
Does the current type and voltage of the mains connection correspond to the specifications on the rating plate?
Connection Line and Fuse Protection
Ensure the electrical connection is established via a fixed connection line with a connector device or an all-pole switch with a contact opening width of at least 3 mm
Rotation Direction Check
8.2 Rotation direction monitoring
Verify the following conditions for three-phase pumps
Is the direction of rotation light green when the pump is briefly switched on?
If the direction of rotation is incorrect, was the pump electrically isolated and two phases interchanged in the terminal box before restarting?
Thermal Insulation Shell Inspection
7.1.3 Insulation of the pump in cooling/air-conditioning systems
Verify the applicability of the insulation
Check the usage of thermal insulation shells
Verify the fitting of the thermal insulation half-shells
Ensure guide pins are engaged in the opposite holes
For cooling/air-conditioning systems, verify the use of diffusion-proof materials
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.