

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Wilo Pump TOP-S80/15
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Startup Check
8 Commissioning
Check that the pump is installed and connected correctly
Ensure the sealing screw and flat gasket are in place
Prime the unit correctly
Verify that the pump rotor compartment is vented automatically
Confirm that dry running for short periods is acceptable
Ensure the motor head, differential pressure screw, and flange connection are not removed for venting
Pump Maintenance
8.1 Filling and Venting
Switch off the pump
Close the check valve on the pressure side
Protect electrical parts from any escaping water
Carefully open the venting screw using a suitable tool
Carefully push back the motor shaft with a screwdriver several times
Wait for 15 to 30 seconds before screwing the venting screw back in
Switch on the pump
Open the check valve again
Electrical Connection Check
Pre-Work Safety Measures
Ensure all poles of the power supply are disconnected before working on the pump
Wait 5 minutes before commencing work on the module for 1~ systems to allow hazardous voltages to dissipate
Connection Verification
Verify that all connections, including potential-free contacts, are voltage-free
Is the module/terminal box undamaged?
Does the current type and voltage of the mains connection correspond to the specifications on the rating plate?
Connection Requirements
Ensure the electrical connection is established via a fixed connection line with a connector device or an all-pole switch with a contact opening width of at least 3 mm
Condensate Drain Check
7.1 Installation / 7.1.3 Insulation
Verify the following conditions for outdoor installations and cooling/air-conditioning systems
Check that condensate drain openings are clear and unobstructed
Verify that insulation has not been applied beyond the motor separation joint
Motor Maintenance
9.1 Dismantling/installation of the motor
Read the chapters 'Dismantling/installation of the motor' and 'Decommissioning' before maintenance
Comply with safety instructions in chapters 2.6, 7, and 8
Close existing check valves on both sides of the pump
Allow the pump to cool to room temperature
Drain the isolated branch of the system
Are check valves fitted?
Drain the entire system if no check valves are fitted
Observe manufacturer's information and safety data sheets on possible additives
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













