Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Wilo Pump TOP-S50/10
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Startup Check
8 Commissioning
Verify installation and connection
Is the sealing screw including the flat gasket in place?
Prime and vent the unit correctly
Is the pump rotor compartment vented automatically after a short operating period?
Was the pump run dry for a short period without harm?
Ensure motor head, differential pressure screw, and flange connection/threaded pipe union are not removed for venting
Pump Leak Check
7.1 Installation
Check for leaks after installation
Periodically verify that all connections remain leak-free during operation
Describe any leakages of hazardous fluids and actions taken to remove them
Motor Protection System Check
Motor Protection System Check
Verify terminal box type and corresponding protection mechanism
Enter the maximum current setting from the rating plate
Does the thermal tripping setting correspond to the maximum current of the speed stage?
Is the Wilo tripping unit SK 602(N)/SK 622(N) present?
Is the thermal winding contact (WSK) connected to a motor protection system?
Describe any issues found during the check
Thermal Insulation Shell Inspection
7.1.3 Insulation of the pump in cooling/air-conditioning systems
Verify that the two half-shells of the thermal insulation are correctly fitted
Check that the guide pins are engaged in the opposite holes
For cooling/air-conditioning systems, verify that commercially-available diffusion-proof thermal insulation materials are used instead of the supplied shells
Pump Maintenance
8.1 Filling and Venting
Switch off the pump
Close the check valve on the pressure side
Protect electrical parts from any escaping water
Carefully open the venting screw using a suitable tool
Carefully push back the motor shaft with a screwdriver several times
Wait for 15 to 30 seconds before screwing the venting screw back in
Screw the venting screw back in
Switch on the pump
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX