Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

ThermoFisher Scientific Centrifuge 75002422
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Seal Replacement
Seal Preparation
Lubricate all seals
Seal Installation
Press the large seal in the outer groove of the rotor body (top detail)
Press the small seal into the groove of the rotor collar (bottom detail)
Rotor Loading and Inspection
Ensure that the rotor lid closes securely
Check if the rotor lid is damaged or dulled
Replace the rotor lid if it is damaged or dulled
Aerosol Tightness Check
Initial Inspection
Inspect seals and seal surfaces for signs of wear and damage
Are all seals and seal surfaces free from damage?
Operational Check
Is the rotor lid properly closed?
Were the sample vessels filled and closed correctly?
Final Verification
Confirm aerosol tightness of the rotor and buckets
Centrifuge Maintenance
Disinfection
Ensure the level of disinfection is achieved according to requirements
Rinse the centrifuge and all affected accessories with water
Allow the centrifuge and accessories to fully drain and dry
Treat the entire surface of aluminum parts including the cavities with corrosion protection oil (70009824) after disinfecting
Safety Precautions
Ensure no one is put at risk in case of contamination
Verify that disinfection methods or agents will not damage the equipment
Contact the manufacturer of the disinfection agent if in doubt
13 Yearly Centrifuge Replacement
Decommissioning the Centrifuge
Has the centrifuge reached its 13-year lifetime limit?
Decommission the centrifuge if the lifetime limit is reached.
Rotor, Buckets, and Lids Inspection
Enter the number of cycles for each rotor.
Is the number of cycles within the specified limit for each rotor?
Replace rotors, buckets, and lids if they exceed the specified cycle limit.
Inspection of Other Accessories
Check for damage or wear on accessories
Centrifuge Cleaning
Cleaning Preparation
Ensure all parts are ready for cleaning
Separate rotor, buckets, lids, tubes, and sealing rings
Cleaning Process
Rinse rotor and accessories with warm water and neutral detergent
Use a soft brush without metal bristles to remove stubborn residue
Rinse rotor and accessories with distilled water
Drying Process
Place rotors on a plastic grate with cavities pointing down
Access the parts list for your equipment in MaintainX.
24 x 1.5/2.0 mL Rotor with ClickSeal Biocontainment Lid
75003424
Dual Row 18 x 2.0/0.5 mL Rotor with Screw-on Lid
75003418
36 x 0.5 mL Rotor with Screw-on Lid
75003436
10 x 5 mL Rotor with ClickSeal Biocontainment Lid
75003465
PCR 8 x 8 Rotor with Screw-on Lid
75003489
24 x 1.5/2.0 mL Rotor with ClickSeal Biocontainment Lid
75003424
Dual Row 18 x 2.0/0.5 mL Rotor with Screw-on Lid
75003418
36 x 0.5 mL Rotor with Screw-on Lid
75003436
10 x 5 mL Rotor with ClickSeal Biocontainment Lid
75003465
PCR 8 x 8 Rotor with Screw-on Lid
75003489
24 x 1.5/2.0 mL Rotor with ClickSeal Biocontainment Lid
75003424
Dual Row 18 x 2.0/0.5 mL Rotor with Screw-on Lid
75003418
36 x 0.5 mL Rotor with Screw-on Lid
75003436
10 x 5 mL Rotor with ClickSeal Biocontainment Lid
75003465
PCR 8 x 8 Rotor with Screw-on Lid
75003489
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX