Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Ametek Silicon Diode Ferroresonant Transformer Type Battery Charger 1260h3-18e
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Selicon Diode Testing
Safety Precautions
Turn OFF and remove fuses of disconnect switch supplying AC power to charger.
Disconnect battery.
Check for voltage on capacitors.
Is there any voltage reading on capacitors?
Discharge capacitors through insulated screwdriver if there is any reading.
Diode Testing Procedure
Disconnect one diode lead to isolate diode from electrical circuitry.
Use a good quality ohmmeter to measure resistance values.
Capacitor Testing
Heed WARNING in Silicon Diode Testing section
Disconnect capacitor
Connect leads of ohmmeter (set to highest scale) to capacitor terminals
Check ohmmeter deflection
Does the pointer deflect, indicating the capacitor is being charged?
Does the pointer deflect in the opposite direction, indicating partial discharge?
If there is no deflection, the capacitor is 'open' and must be replaced
If the meter needle moves and stops at one value, replace the capacitor
3 Monthly Charger Cleaning
Preparation
Ensure the charger is turned off and unplugged
Gather cleaning materials (clean, dry air source or hand bellows)
Cleaning Process
Set air pressure to not over 25 psi (172 kPa)
Wipe all accessible surfaces of the unit's interior components
Blow out all dirt from the unit's interior components using clean, dry air or hand bellows
Post-Cleaning
Is the unit clean, dry, and well ventilated?
Charger Inspection
Electrical Connections Inspection
Check and tighten all electrical connections
Wiring Inspection
Check for broken wiring or damaged insulation on wiring
Safety Precautions
WARNING: ELECTRICAL SHOCK HAZARD
Ensure internal parts are clean and dry to prevent transformer shorting
Replace all charger cabinet panels after servicing to ensure proper cooling and protection
Final Safety Check
Charging Rate Adjustment
Pre-adjustment Safety Checks
Ensure no bad connections or damage to charger is affecting the charging process.
Verify proper charging procedure has been followed.
Turn OFF and remove fuses of disconnect switch supplying AC power to charger.
Disconnect battery.
Check for voltage on capacitors.
Is there any voltage reading on capacitors?
Discharge capacitors through insulated screwdriver if there is any voltage reading.
Charging Rate Adjustment
Access the parts list for your equipment in MaintainX.
Panel, Top
194457
Label, Frame Ground
405548
Contactor, Line
406243-1
Label, L1
400092
Label, L2
400096
Panel, Top
194457
Label, Frame Ground
405548
Contactor, Line
406243-1
Label, L1
400092
Label, L2
400096
Panel, Top
194457
Label, Frame Ground
405548
Contactor, Line
406243-1
Label, L1
400092
Label, L2
400096
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













