MaintainX Asset Hub logo
EnterprisePricing
Ohaus

Ohaus Indicator T31P

Need answers fast?
Explore the manual using AI.

Ohaus Indicator T31P
Ohaus Indicator T31P

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ohaus Indicator T31P

Ohaus Indicator T31P

Create an account to install this asset package.

Maintenance Plans for Ohaus Indicator Model T31P

Integrate maintenance plans directly into your work orders in MaintainX.

Indicator RS232 Interface / Print Test

Check mark

Setup Communication Parameters

Check mark

Ensure communication parameters match between the Indicator and the external device

Check mark

Test Print Function

Check mark

Press the Print/Units button on the Indicator

Check mark

Did the external printer or computer receive the print command?

Check mark

Post-Test Verification

Check mark

Describe any issues encountered during the test

Check mark

Technician's signature to confirm test completion

Run this procedureArrow right

Battery Replacement

Check mark

Disassembly

Check mark

Unplug the Indicator from the AC Adapter

Check mark

Remove the four screws from the Bottom Housing

Check mark

Carefully separate the Top Housing and Bottom Housing

Check mark

Battery Removal

Check mark

Remove the quick-connect tabs that hold the Battery Cables in place

Check mark

Remove the four screws, each with a washer, that secure the Battery to the Bottom Housing

Check mark

Carefully lift away the bracket that holds the Battery in place

Check mark

Battery Installation

Run this procedureArrow right

Printed Circuit Board Replacement

Check mark

Preparation

Check mark

Unplug the Indicator from the AC power source

Check mark

Disassembly

Check mark

Remove the four screws from the Bottom Housing

Check mark

Carefully separate the Top Housing and Bottom Housing

Check mark

Disconnecting Components on T31XW

Check mark

Remove the Keypad connector ribbon cable by pulling it out

Check mark

If the RS232 Interface is connected, disconnect its wire leads from the PCB's RS232 Terminal Block J7

Check mark

Disconnecting Components on T31P

Run this procedureArrow right

Indicator Overload/Underload Test

Check mark

Underload Test

Check mark

Ensure the Indicator is ON and no mass is on the scale base.

Check mark

Lift up on the scale base platform and check if the display indicates Error 8.2.

Check mark

Release the platform and check if the display returns to zero.

Check mark

Overload Test

Check mark

Place a mass on the scale base platform that slightly exceeds its capacity.

Check mark

Observe if the Indicator display shows Error 8.1.

Check mark

Remove the mass and check if the display returns to zero.

Check mark

Ensure not to exceed Load Cell capacity during the test.

Run this procedureArrow right

Indicator Calibration Retention Test

Check mark

Turn the Indicator OFF and disconnect the AC Adapter or power cord

Check mark

Wait one minute, then reconnect the AC Adapter or power cord to the Indicator

Check mark

Check to ensure that the Indicator retained calibration settings

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ohaus

Explore Other Assets