MaintainX Asset Hub logo
EnterprisePricing
Mitsubishi

Mitsubishi Split-Type Air Conditioner PUZ-A24NHA7

Need answers fast?
Explore the manual using AI.

Mitsubishi Split-Type Air Conditioner PUZ-A24NHA7
Mitsubishi Split-Type Air Conditioner PUZ-A24NHA7

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Mitsubishi Split-Type Air Conditioner PUZ-A24NHA7

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mitsubishi Split-Type Air Conditioner PUZ-A24NHA7

Mitsubishi Split-Type Air Conditioner PUZ-A24NHA7

Create an account to install this asset package.

Maintenance Plans for Mitsubishi Split-Type Air Conditioner Model PUZ-A24NHA7

Integrate maintenance plans directly into your work orders in MaintainX.

Outdoor Unit LEV Replacement

Check mark

Upload Photo 1

Check mark

Service panel removed

Check mark

Top panel removed

Check mark

Upload Photo 4

Check mark

Electrical parts box removed

Check mark

Valve bed fixing screws and ball valve and stop valve fixing screws removed

Check mark

Valve bed removed

Check mark

Right side panel fixing screws removed

Check mark

Right side panel removed

Run this procedureArrow right

Outdoor Unit Reactor Replacement

Check mark

Remove the service panel

Check mark

Upload a photo of the removed service panel

Check mark

Remove the top panel

Check mark

Upload a photo of the removed top panel

Check mark

Remove the electrical parts box

Check mark

Upload a photo of the removed electrical parts box

Check mark

Remove the reactor fixing screws

Check mark

Number of screws removed

Check mark

Note: The reactor is attached to the rear of the electrical parts box.

Run this procedureArrow right

Outdoor Unit High Pressure Switch Replacement

Check mark

Upload Photo 1 of the service panel and top panel removal

Check mark

Upload Photo 4 of the electrical parts box removal

Check mark

Right side panel fixing screws removed

Check mark

Lead wire of high pressure switch pulled out

Check mark

Refrigerant recovered

Check mark

Welded part of high pressure switch removed

Check mark

Note 1: Recover refrigerant without spreading it in the air.

Check mark

Note 2: The welded part can be removed easily by removing the right side panel.

Check mark

Note 3: When installing the high pressure switch, cover it with a wet cloth to prevent it from heating (100°C or more), then braze the pipes so that the inside of pipes are not oxidized.

Run this procedureArrow right

Outdoor Unit Electrical Parts Box Replacement

Check mark

Upload a photo of the service panel before removal

Check mark

Service panel removed

Check mark

Upload a photo of the top panel before removal

Check mark

Top panel removed

Check mark

Indoor/outdoor connecting wire disconnected from terminal block

Check mark

Connector CNF1, LEV-A and LEV-B disconnected from the controller circuit board

Check mark

Disconnect the pipe-side connections of the following parts

Check mark

Terminal cover removed and compressor lead wire disconnected

Check mark

Electrical parts box fixing screw removed and electrical parts box detached

Run this procedureArrow right

Outdoor Unit Refrigirant Charging

Check mark

Cautions for service

Check mark

Refrigerant recovered from the unit completely

Check mark

Refrigerant not released in the air

Check mark

Amount of refrigerant charged in the cycle

Check mark

Filter drier installed for new refrigerant

Check mark

Additional refrigerant charge

Check mark

Cylinder for R410A is a syphon type

Check mark

Charging performed with the cylinder of syphon stood vertically

Check mark

Service tools

Run this procedureArrow right

Parts for Mitsubishi Split-Type Air Conditioner PUZ-A24NHA7

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Inverter Starter Type, Hermetic Compressor - 1,2 KW

SNB172FWHM1

Inverter Starter Type, Hermetic Compressor - 1,2 KW

SNB172FWHM1

Inverter Starter Type, Hermetic Compressor - 1,2 KW

SNB172FWHM1

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mitsubishi

Explore Other Assets