MaintainX, an Autodesk company
EnterprisePricing
Lochinvar

Lochinvar Water Heater CGL200080

Need answers fast?
Explore the manual using AI.

Lochinvar Water Heater CGL200080
Lochinvar Water Heater CGL200080

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Lochinvar Water Heater CGL200080

Lochinvar Water Heater CGL200080

Create an account to install this asset package.

Maintenance Plans for Lochinvar Water Heater Model CGL200080

Integrate maintenance plans directly into your work orders in MaintainX.

Venting Check

Check mark

Initial Setup

Check mark

Seal any unused openings in the venting system

Check mark

Inspect the venting system for proper size and horizontal pitch

Check mark

Check for blockage, restriction, leakage, corrosion, and other deficiencies

Check mark

Building Preparation

Check mark

Close all building doors and windows

Check mark

Close all doors between the water heater space and other spaces

Check mark

Turn on all appliances not connected to the venting system

Check mark

Turn on all exhaust fans at maximum speed

Run this procedureArrow right

1 Yearly Relief Valve Check

Check mark

Valve Operation Check

Check mark

Lift the lever at the top of the valve several times until the valve seats properly and operates freely.

Check mark

Check operation of other relief valves if present

Check mark

Safety Precautions

Check mark

Ensure water discharge is safe and does not cause water damage.

Check mark

Avoid contact with hot water during valve operation.

Check mark

Problem Identification

Check mark

Does the temperature and pressure relief valve discharge periodically or continuously?

Check mark

Describe any issues observed with the valve operation.

Run this procedureArrow right

Water Heater Cleaning

Check mark

Preparation

Check mark

Shut off gas supply to the heater

Check mark

Drain the water heater

Check mark

Access Cleanout Opening

Check mark

Remove outer cover plate from lower side of heater jacket

Check mark

Remove six hex head screws securing tank cleanout plate

Check mark

Remove cleanout plate

Check mark

Cleaning Process

Check mark

Remove lime, scale, or sediment carefully to avoid damaging glass lining

Run this procedureArrow right

1 Yearly Pilot Burner Maintenance

Check mark

Accessing the Pilot Burner

Check mark

Unfasten two screws to burner cover and remove it

Check mark

Locate the burner with pilot and remove screw holding burner to manifold

Check mark

Unfasten pilot tubing from valve and slide out burner and pilot

Check mark

Servicing the Pilot Burner

Check mark

Keep pilot free of lint

Check mark

Clean the burner head

Check mark

Clean the primary air opening

Check mark

Clean the orifice of the pilot burner

Run this procedureArrow right

Initial 6 Months Water Heater Inspection

Check mark

Lime Buildup Measurement

Check mark

Measure the depth of lime buildup in the heater

Check mark

Record the depth of lime buildup in inches

Check mark

Deliming Schedule Recommendation

Check mark

Determine deliming frequency based on lime buildup

Check mark

Safety Precautions

Check mark

Review handling instructions on the deliming product label

Check mark

Post Inspection Actions

Check mark

Is deliming required immediately based on the measurement?

Run this procedureArrow right

Parts for Lochinvar Water Heater CGL200080

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Pilot Burner, Natural Gas

9004541215

Pilor Burner, Propane Gas

9004542215

Nipple Collars

74060

Leg Kit

9003425205

Plate Gasket

9004099215

Pilot Burner, Natural Gas

9004541215

Pilor Burner, Propane Gas

9004542215

Nipple Collars

74060

Leg Kit

9003425205

Plate Gasket

9004099215

Pilot Burner, Natural Gas

9004541215

Pilor Burner, Propane Gas

9004542215

Nipple Collars

74060

Leg Kit

9003425205

Plate Gasket

9004099215

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Lochinvar

Explore Other Assets