MaintainX, an Autodesk company
EnterprisePricing
KSB SE & Co. KGaA

KSB SE & Co. KGaA Submersible Motor Pump KRT K 100-253

Need answers fast?
Explore the manual using AI.

KSB SE & Co. KGaA Submersible Motor Pump KRT K 100-253
KSB SE & Co. KGaA Submersible Motor Pump KRT K 100-253

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for KSB SE & Co. KGaA Submersible Motor Pump KRT K 100-253

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

KSB SE & Co. KGaA Submersible Motor Pump KRT K 100-253

KSB SE & Co. KGaA Submersible Motor Pump KRT K 100-253

Create an account to install this asset package.

Maintenance Plans for KSB SE & Co. KGaA Submersible Motor Pump Model KRT K 100-253

Integrate maintenance plans directly into your work orders in MaintainX.

4000 Hourly / 1 Yearly Power Cables Inspection

Check mark

NOTE: In demanding conditions, reduce the maintenance interval accordingly. For a consultation or any queries please contact KSB Service.

Check mark

Visual Inspection

Check mark

Ensure the pump set has been lifted out of the pump sump and cleaned (Applies to installation type K only).

Check mark

Inspect the power cables for visible damage.

Check mark

Replace any damaged components with original spare parts.

Check mark

Checking the Ground Conductor

Check mark

Measure the resistance between the ground conductor and chassis ground.

Check mark

Is the electrical resistance lower than 1 Ω?

Check mark

Replace any damaged components with original spare parts.

Run this procedureArrow right

Submersible Motor Pump Inspection

Check mark

Safety Precautions

Check mark

Wear safety clothing and a protective mask if required

Check mark

Observe all legal regulations on the disposal of fluids posing a health hazard

Check mark

Preparation

Check mark

Close the shut-off element on the suction side

Check mark

Switch off the drive and ensure it cannot be re-started unintentionally

Check mark

Close the shut-off element on the discharge side

Check mark

Inspection Hole Opening

Check mark

Open the drain plug (auxiliary connection 6B)

Run this procedureArrow right

4000 Hourly / 1 Yearly Insulation Resistance Inspection

Check mark

Pre-Inspection Note

Check mark

In demanding conditions (e.g. high mechanical and hydraulic loads) reduce the maintenance interval accordingly. For a consultation or any queries please contact KSB Service.

Check mark

Preparation

Check mark

Ensure the pump set has been disconnected in the control cabinet.

Check mark

Use an insulation resistance measuring device.

Check mark

Ensure the maximum measuring voltage is 500 V (maximum permissible voltage 1000 V).

Check mark

Measure the winding to chassis ground

Check mark

Connect all winding ends together.

Check mark

Measure the insulation resistance of the winding to chassis ground.

Run this procedureArrow right

4000 Hourly / 1 Yearly Lifting Accessories Inspection

Check mark

Check the bail or eyebolt including fasteners for any visible damage

Check mark

Replace any damaged components with original spare parts

Check mark

Consultation or queries

Check mark

Contact KSB Service for consultation or queries

Run this procedureArrow right

5 Yearly Coolant Change

Check mark

Preparation

Check mark

Place a suitable container under screw plug 903.33

Check mark

Ensure the pump set is in a horizontal position

Check mark

Draining the Coolant

Check mark

Unscrew both screw plugs 903.34/903.35 with joint rings 411.34/411.35 at the coolant filler openings

Check mark

Undo screw plug 903.33 with joint ring 411.33 and drain off the coolant

Check mark

Inspection

Check mark

Check the appearance of the drained coolant

Check mark

Filling the Coolant

Run this procedureArrow right

Parts for KSB SE & Co. KGaA Submersible Motor Pump KRT K 100-253

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Motor Unit

80-1

Cable Gland

834

Rotor

818

Impeller

230

Casing Wear Ring

502

Motor Unit

80-1

Cable Gland

834

Rotor

818

Impeller

230

Casing Wear Ring

502

Motor Unit

80-1

Cable Gland

834

Rotor

818

Impeller

230

Casing Wear Ring

502

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from KSB SE & Co. KGaA

Explore Other Assets