The Haas Automation CNC Vertical Machining Center VF-11/40 is a robust and versatile machine designed for precision machining. Ideal for high-volume production, it offers advanced features and reliable performance, making it a top choice for manufacturers seeking efficiency and accuracy in their operations.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Haas Automation CNC Vertical Machining Center VF-11/40
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Weekly CNC Vertical Machining Center Maintenance
Check Through the Spindle Coolant (TSC) filters. Clean or replace element if needed.
Check for proper operation of auto drain on filter regulator.
On machines with the TSC option, clean the chip basket on the coolant tank. Remove the tank cover and remove any sediment inside the tank. Be careful to disconnect the coolant pump from the controller and POWER OFF the control before working on the coolant tank. Do this MONTHLY for machines without the TSC option.
Check air gauge/regulator for 85 psi. For 15K-spindle machines, check spindle air pressure regulator for 20 psi.
For machines with the TSC option, place a dab of grease on the V-flange of tools. Do this MONTHLY for machines without the TSC option.
Clean exterior surfaces with mild cleaner. DO NOT use solvents.
Check the hydraulic counterbalance pressure according to the machines specifications.;
1 Daily CNC Vertical Machining Center Maintenance
Check coolant level
Check way lube lubrication tank level
Clean chips from way covers and bottom pan
Clean chips from tool changer
Wipe spindle taper with a clean cloth rag and apply light oil
Sign off on the daily CNC vertical machining center maintenance
1 Monthly CNC Vertical Machining Center Maintenance
Gear Box Oil Level Check
40 taper spindles: Oil dripping from overflow tube at bottom of sump tank after adding oil from top?
50 taper spindles: Oil level visible in sightglass?
Way Covers Inspection and Lubrication
Way covers operating properly?
Did you lubricate the way covers with light oil?
Tool Changer Guide Rails Lubrication
Did you place a dab of grease on the outside edge of the guide rails of the tool changer and run through all tools?
Coolant Replacement and Tank Cleaning
Bulb Replacement
TURN OFF power to the machine at the main breaker
Remove the retainer and the light lens
Remove the light bulb and replace
Replace the light lens and retainer
Restore power to the machine
Sign off on the bulb replacement
1 Yearly CNC Vertical Machining Center Maintenance
Gearbox Oil Replacement
Drained the oil from the bottom of the gearbox?
Removed inspection cover beneath spindle head?
Added oil slowly from top until oil begins dripping from overflow tube at bottom of sump tank?
For 50 taper spindles, added oil from the side of the transmission?
Oil Filter Check
Checked oil filter and cleaned out residue at bottom of filter?
Air Filter Replacement
Replaced air filter on control box?
Access the parts list for your equipment in MaintainX.
Shuttle Cover
25-9342
Cam Follower T/C
54-0010
Shuttle Gusset
20-9293
Connector Bracket
25-7162
Rider Trap Door
22-7163
Shuttle Cover
25-9342
Cam Follower T/C
54-0010
Shuttle Gusset
20-9293
Connector Bracket
25-7162
Rider Trap Door
22-7163
Shuttle Cover
25-9342
Cam Follower T/C
54-0010
Shuttle Gusset
20-9293
Connector Bracket
25-7162
Rider Trap Door
22-7163
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













