Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Atlas Copco Oil-Injected Rotary Screw Compressor GA26VSD+
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
4000 Hourly / 1 Yearly Oil-Injected Rotary Screw Compressor Check
Check condition of the air intake hose between air filter and compressor element
Pressure reading
Temperature reading
Check operation of cooling fans of converter
Check blow-off solenoid valve after stopping and pressing the emergency stop button
4000 Hourly / 1 Yearly Oil, Oil Filter and Oil Separator Change
WARNING! The operator must apply all relevant Safety precautions
Always drain the compressor oil at all drain points. Used oil left in the compressor can contaminate the oil system and can shorten the lifetime of the new oil
Never mix lubricants of different brands or types as they may not be compatible and the oil mix will have inferior properties. A label, indicating the type of oil filled ex-factory, is stuck on the air receiver/oil tank
Run the compressor until warm and stop the compressor
Close the air outlet valve and switch off the voltage
Wait 3 minutes for the compressor to depressurise the vessel
Open the condensate drain valve to depressurise the cooler. (see condensate system) and close again
Unscrew the oil filler plug (FC) just one turn to permit any remaining pressure in the system to escape
Cover the duct of the heat sink on the electric cabinet
1 Daily Oil-Injected Rotary Screw Compressor Check
Check oil level. If needed, top up the oil
Check readings on display
Check that condensate is discharged during operation
Drain condensate
4000 Hourly / 1 Yearly Roto-Foodgrade Fluid Replacement
Warning: This procedure requires trained personnel with PPE!
Enter the ambient temperature
Enter the element outlet temperature
Select the exchange interval based on the temperatures
Was the Roto-Foodgrade Fluid successfully replaced?
Sign off on the fluid replacement
1 Monthly Condenser Cleaning
Compressor stopped and air outlet valve closed
Voltage switched off
Upload a photo of the condenser inlet before cleaning
Dirt removed from the condenser inlet with a vacuum cleaner
Condenser cleaned with an air jet in the reverse direction to normal flow using low pressure air
Compressed air nozzle kept more than 30 cm away from the condenser
Upload a photo of the condenser after cleaning
Dust removed from inside the dryer with a vacuum cleaner
Water or solvents not used for cleaning
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX