Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Greenheck Plenum Fan APH-40
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Fan Maintenance
Safety Precautions
Disconnect the electrical supply
Secure fan impeller
Lubrication
Lubricate bearings
Lubricate motor
Check Components for Tightness
Check wheel for tightness
Check housing for tightness
1 Monthly Fan Maintenance
Inspection and Rotation
Inspect fan for moisture or dirt accumulations
Was moisture or dirt found on parts?
Locate and eliminate source of moisture or dirt, if found
Rotate the fan wheel by hand
Paint and Coating Maintenance
Is there any paint deterioration?
Consider touch-up or repainting if paint deterioration begins
Are there signs of rust on machined parts?
3 Monthly Fan Maintenance
Bearing Maintenance
Purge bearings
Fan Motor Maintenance
Energize fan motor
30 Daily Fan Operation
Fan Operation Check
Run each fan for a complete cycle
Bump each fan if not run completely
Safety Precautions
Check fan RPM when adjusting operating frequency
Consult manufacturer before changing fan operating conditions
Post Operation Inspection
Is there any unusual noise or vibration during operation?
Is there any visible condensation on the fan components?
Equipment Check
Pre-Start Checks
Confirm that building supply voltage matches the voltage for which the unit is wired.
Disconnect and lock-out all power switches to fan.
Check all piping and wiring penetrations made by contractors for water tightness.
Check all fasteners, set screws and locking collars for tightness.
Rotate the fan wheel by hand and assure no parts are rubbing.
Check for bearing alignment and lubrication.
Check the V-belt drive for proper alignment and tension.
Check all guarding for secure attachment and non-interference with rotating parts.
Access the parts list for your equipment in MaintainX.
PNT Field Repair Kit
HAZ2597
Concrete Grey Kit
RAL 7023
PNT Field Repair Kit
HAZ2597
Concrete Grey Kit
RAL 7023
PNT Field Repair Kit
HAZ2597
Concrete Grey Kit
RAL 7023
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX