MaintainX Asset Hub logo
EnterprisePricing
Greenheck

Greenheck Make-Up Air Unit IGX-P120-H22-MF-O

Need answers fast?
Explore the manual using AI.

Greenheck Make-Up Air Unit IGX-P120-H22-MF-O
Greenheck Make-Up Air Unit IGX-P120-H22-MF-O

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Greenheck Make-Up Air Unit IGX-P120-H22-MF-O

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Greenheck Make-Up Air Unit IGX-P120-H22-MF-O

Greenheck Make-Up Air Unit IGX-P120-H22-MF-O

Create an account to install this asset package.

Maintenance Plans for Greenheck Make-Up Air Unit Model IGX-P120-H22-MF-O

Integrate maintenance plans directly into your work orders in MaintainX.

Chilled Water Coils Maintenance

Check mark

Blowing-Out Coils

Check mark

Close valves on the supply and return lines

Check mark

Open drain valves and/or drain plug. Remove vent plug to allow coil to drain faster

Check mark

Connect a blower to the caps. Do not connect the blower to the air vent or drain plug

Check mark

Close the vent plug on the header that the blower is connected to. Open the drain valve or cap on the other header

Check mark

Turn on blower for 30 minutes

Check mark

Did the mirror fog up when placed at discharge?

Check mark

Repeat procedure until no fog appears on the mirror

Check mark

After drying the coil, wait a few minutes then repeat Step #5

Run this procedureArrow right

V-Belt Drive Check

Check mark

Safety Precautions

Check mark

Lock-out the gas supply to the unit

Check mark

Lock-out the electrical power to the unit

Check mark

V-Belt Inspection

Check mark

Check the V-belt drive for the following issues

Check mark

Measure the deflection in the belt

Check mark

Is the belt tension within the normal range?

Check mark

Is the drive alignment correct using a straight edge across both sheaves?

Check mark

Belt and Sheave Maintenance

Run this procedureArrow right

Equipment Check

Check mark

Pre-Installation Checks

Check mark

Check Electrical Connections

Check mark

Check Voltage

Check mark

Check the Fan Rotation

Check mark

Check for Vibration

Check mark

Motor Check

Check mark

Measure the motor’s voltage, amps and RPM

Check mark

Air Volume Measurement

Check mark

Measure the unit’s air volume

Run this procedureArrow right

Combustion Blower Motor Cleaning

Check mark

Preparation

Check mark

Ensure the motor is powered off and disconnected from the power source

Check mark

Gather necessary cleaning materials (cloth, brush, etc.)

Check mark

Cleaning Process

Check mark

Clean the exterior surfaces of the motor to remove dust and grease build-up

Check mark

Ensure no water or solvents have entered the motor or bearings

Check mark

Post-Cleaning Inspection

Check mark

Verify that the motor housing is free of dust and grease

Check mark

Confirm that the motor bearings have not been sprayed with water, steam, or solvents

Run this procedureArrow right

Initial Equipment Inspection

Check mark

Verification of Received Parts

Check mark

Verify all required parts and correct quantity received

Check mark

Inspect interior of unit cabinet for shipped loose items

Check mark

Report any missing items to local representative

Check mark

Shipment Confirmation

Check mark

Confirm shipment limited to items on the bill of lading

Check mark

Storage Preparation

Check mark

Maintain even temperatures to prevent condensation

Check mark

Remove accumulations of dirt, water, ice, or snow and wipe dry

Run this procedureArrow right

Parts for Greenheck Make-Up Air Unit IGX-P120-H22-MF-O

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Auto Drain and Fill Valve 1/2 Inch (13 Mm)

461262

Auto Drain and Fill Valve 1/4 Inch (6 Mm)

461263

Auto Drain and Fill Valve 3/4 Inch (19 Mm)

461264

Auto Drain and Fill Valve 1/2 Inch (13 Mm)

461262

Auto Drain and Fill Valve 1/4 Inch (6 Mm)

461263

Auto Drain and Fill Valve 3/4 Inch (19 Mm)

461264

Auto Drain and Fill Valve 1/2 Inch (13 Mm)

461262

Auto Drain and Fill Valve 1/4 Inch (6 Mm)

461263

Auto Drain and Fill Valve 3/4 Inch (19 Mm)

461264

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Greenheck

Explore Other Assets