

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Goodman Gas-Fired Warm Air Furnace AKSS90905DX
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Furnace Inspection
Flue Pipe System Inspection
Check for blockage in the flue pipe system.
Check for leakage in the flue pipe system.
Inspect the outside termination of the flue pipe.
Inspect connections at and internal to the furnace.
Heat Exchanger Inspection
Check for corrosion within the heat exchanger passageways.
Check for buildup within the heat exchanger passageways.
Burners Inspection
2 Monthly Filter Replacement
Filter Replacement Preparation
Turn OFF electrical power to furnace
Filter Removal and Replacement
Remove filter(s) from the following locations
Replace filter(s) by reversing the procedure for removal
Post Replacement
Turn ON electrical power to furnace
Filter Type Verification
Was the filter replaced with the same type and size?
Burner Visual Inspection
Pre-Inspection Setup
Turn on the furnace at the thermostat
Allow several minutes for flames to stabilize
Flame Inspection
Are the flames stable and quiet?
Are the flames soft and blue?
Do the flames extend directly outward from the burners without curling, floating, or lifting off?
Do the flames impinge on the sides of the heat exchanger firing tubes?
Post-Inspection
Heat Exchanger Flue Passageway Inspection
Preparation
Turn OFF the electrical power and gas supply to the furnace
Disconnect the gas line and remove the burner/manifold assembly
Disconnect the flue pipe system from the induced draft blower
Disassembly
Remove the induced draft blower and the drain and pressure tap hoses from the recuperator coil front cover
Remove the recuperator coil front cover to expose the coil tubes and turbulators
Remove the recuperator coil turbulators individually
Cleaning
Access the parts list for your equipment in MaintainX.
Blocked Drain Kit
0270K00012
Vent Drain Kit
RF000142
Side Wall Vent Kit
0170K00000S
Blocked Drain Kit
0270K00012
Vent Drain Kit
RF000142
Side Wall Vent Kit
0170K00000S
Blocked Drain Kit
0270K00012
Vent Drain Kit
RF000142
Side Wall Vent Kit
0170K00000S
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













