MaintainX Asset Hub logo
EnterprisePricing
Greenheck

Greenheck Make-Up Air Unit IGX-P120-H22-MF-R

Need answers fast?
Explore the manual using AI.

Greenheck Make-Up Air Unit IGX-P120-H22-MF-R
Greenheck Make-Up Air Unit IGX-P120-H22-MF-R

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Greenheck Make-Up Air Unit IGX-P120-H22-MF-R

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Greenheck Make-Up Air Unit IGX-P120-H22-MF-R

Greenheck Make-Up Air Unit IGX-P120-H22-MF-R

Create an account to install this asset package.

Maintenance Plans for Greenheck Make-Up Air Unit Model IGX-P120-H22-MF-R

Integrate maintenance plans directly into your work orders in MaintainX.

Motor Maintenance

Check mark

Safety Precautions

Check mark

Lock-out the gas supply to the unit

Check mark

Lock-out the electrical power to the unit

Check mark

Cleaning

Check mark

Clean exterior surfaces of the motor

Check mark

Ensure no water or solvents enter the motor or bearings

Check mark

Lubrication

Check mark

Check if the motor has grease fittings

Check mark

Grease the motor according to manufacturer's recommendations

Run this procedureArrow right

Equipment Check

Check mark

Initial Equipment Checks

Check mark

Tug test all internal electrical connections to ensure no loose connections occurred during shipment.

Check mark

Enter the supplied voltage, hertz, and phase.

Check mark

Does the supplied voltage, hertz, and phase match the unit and motor(s) nameplate information?

Check mark

Is the fan rotating in the correct direction?

Check mark

Check for unusual noise, vibration, or overheating of the bearings.

Check mark

Motor and Air Volume Checks

Check mark

Measure the motor’s voltage, amps, and RPM.

Check mark

Do the motor’s voltage, amps, and RPM match the specifications?

Run this procedureArrow right

Chilled Water Coil Maintenance

Check mark

Safety Precautions

Check mark

Lock-out the gas supply to the unit

Check mark

Lock-out the electrical power to the unit

Check mark

Fluid Testing and Correction

Check mark

Test the circulating fluid for sediment

Check mark

Test the circulating fluid for corrosive products

Check mark

Test the circulating fluid for biological contaminants

Check mark

Take corrective measures if any contaminants are found

Check mark

Fluid Maintenance

Run this procedureArrow right

Supply Wheel and Snow Accumulation Cleaning

Check mark

Safety Precautions

Check mark

Lock-out the gas supply to the unit

Check mark

Lock-out the electrical power to the unit

Check mark

Inspect Supply Wheel

Check mark

Check for oil and dust accumulation on the wheel

Check mark

Clean the wheel and housing if oil and dust accumulation is found

Check mark

Snow Clearance

Check mark

Clear snow away from roof mounted units

Check mark

Ensure snow is clear of the intake and access doors

Run this procedureArrow right

Burners and Orifices Cleaning

Check mark

Preparation

Check mark

Turn off electrical supply to the unit

Check mark

Turn off gas supply to the unit

Check mark

Disassembly

Check mark

Disconnect the union between manifold and gas valve

Check mark

Remove burner manifold and burner assembly

Check mark

Inspection and Cleaning

Check mark

Inspect orifices and burners for debris

Check mark

Clean orifices and burners as necessary

Run this procedureArrow right

Parts for Greenheck Make-Up Air Unit IGX-P120-H22-MF-R

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Auto Drain and Fill Valve 1/2 Inch (13 Mm)

461262

Auto Drain and Fill Valve 1/4 Inch (6 Mm)

461263

Auto Drain and Fill Valve 3/4 Inch (19 Mm)

461264

Auto Drain and Fill Valve 1/2 Inch (13 Mm)

461262

Auto Drain and Fill Valve 1/4 Inch (6 Mm)

461263

Auto Drain and Fill Valve 3/4 Inch (19 Mm)

461264

Auto Drain and Fill Valve 1/2 Inch (13 Mm)

461262

Auto Drain and Fill Valve 1/4 Inch (6 Mm)

461263

Auto Drain and Fill Valve 3/4 Inch (19 Mm)

461264

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Greenheck

Explore Other Assets