

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Greenheck Make-Up Air Unit IGX-P120-H22-MF-K
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial Equipment Check
Tools Required
Ensure all tools are available
Safety Precautions
Disconnect and lock-out all power and gas
Check for foreign objects in housing, fan, and ductwork
Initial Checks
Check electrical connections
Check fasteners for tightness
Check supply fan clearance
Bearing Lubrication
Safety Precautions
Lock-out the gas supply to the unit
Lock-out the electrical power to the unit
Lubrication Schedule
Enter the fan RPM
Enter the bearing bore size (in inches)
Select the operation type
Lubrication Process
Select the type of bearing
Motor Maintenance
Safety Precautions
Lock-out the gas supply to the unit
Lock-out the electrical power to the unit
Motor Cleaning
Clean exterior surfaces of the motor
Ensure no water or solvents enter the motor or bearings
Avoid spraying motors and bearings with steam, water, or solvents
Motor Lubrication
Check if the motor is supplied with grease fittings
Chilled Water Coil Maintenance
Safety Precautions
Lock-out the gas supply to the unit
Lock-out the electrical power to the unit
Fluid Testing and Correction
Test the circulating fluid for sediment
Test the circulating fluid for corrosive products
Test the circulating fluid for biological contaminants
Describe corrective measures taken
Fluid Maintenance
Evaporative Cooling Module Maintenance
Preparation
Has the water supply been shut off?
Record the outside temperature in ºF
Draining Process
Drain all exposed lines
Cleaning Process
Clean all interior parts of mineral deposits or foreign materials
Inspection and Replacement
Inspect for worn or non-functioning parts
Access the parts list for your equipment in MaintainX.
Auto Drain and Fill Valve 1/2 Inch (13 Mm)
461262
Auto Drain and Fill Valve 1/4 Inch (6 Mm)
461263
Auto Drain and Fill Valve 3/4 Inch (19 Mm)
461264
Auto Drain and Fill Valve 1/2 Inch (13 Mm)
461262
Auto Drain and Fill Valve 1/4 Inch (6 Mm)
461263
Auto Drain and Fill Valve 3/4 Inch (19 Mm)
461264
Auto Drain and Fill Valve 1/2 Inch (13 Mm)
461262
Auto Drain and Fill Valve 1/4 Inch (6 Mm)
461263
Auto Drain and Fill Valve 3/4 Inch (19 Mm)
461264
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













