Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Goodman Condensing Unit GSX130601B
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Contactor And Relays Check
Safety Precautions
Disconnect all power sources before servicing or installing
Coil Testing
Remove the leads from the holding coil
Test across the coil terminals using an ohmmeter
Checking Contactor Contacts - Single Phase
Disconnect the wire leads from the terminal (T) side of the contactor
Energize the contactor with power ON
Test across terminals L2 - T1 using a voltmeter
Reversing Valve And Solenoid Check
Initial System Check
Start the system and switch operation from COOLING to HEATING cycle
Did the valve change its position?
Voltage Testing
Test the voltage at the valve coil terminals while the system is on the COOLING cycle
Is voltage registered at the coil terminals?
Thermostat and Wiring Check (Legacy Systems)
Is the system a legacy wired heat pump?
Check the operation of the thermostat and continuity of the connecting wiring from the 'O' terminal of the thermostat to the unit
Compressor Check
Pre-Inspection Safety Measures
Ensure all open flames are extinguished
Turn off electrical power and other heat sources
Compressor Terminal Inspection
Verify that the following components are properly in place and secured
System Evacuation Verification
Has the hermetic system been properly evacuated?
Electrical Terminal Testing
Does the test indicate shorted, grounded, or open windings?
High Pressure Control Check
Safety Precautions
Disconnect all power sources before servicing or installing
Initial Checks
Check continuity across terminals of high pressure control with wire removed using an ohmmeter
Pressure Testing
Attach a gauge to the dill valve port on the base valve
Turn power ON
Start the system and place a piece of cardboard in front of the condenser coil to raise condensing pressure
Record the pressure at which the high pressure control cuts out
Emerson Ultratech Ecm Motors Check
General Checks/Considerations
Check power supply to the air handler or modular blower
Check motor power harness
Check motor control harness
Check thermostat and thermostat wiring
Check blower wheel
Ensure motor and wheel turn freely
Check housing for cracks and/or corrosion
Check motor mounting bracket
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX