MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z45/25J DC

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z45/25J DC
Genie Articulated Boom Lift Z45/25J DC

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z45/25J DC

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z45/25J DC

Genie Articulated Boom Lift Z45/25J DC

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z45/25J DC

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Battery Inspection

Check mark

- Inspect battery

Check mark

WARNING!

Check mark

Electrocution/burn hazard

Check mark

Contact with electrically charged circuits could result in death or serious injury. Remove all rings, watches and other jewelry

Check mark

WARNING!

Check mark

Bodily injury hazard. Batteries contain acid. Avoid spilling or contacting battery acid

Check mark

Neutralize battery acid spills with baking soda and water

Check mark

Note: Fully charge the batteries and allow the batteries to rest 24 hours before performing this procedure to allow the battery cells to equalize

Check mark

1. Open the side covers

Run this procedureArrow right

250 Hourly Deutz Engine Maintanance

Check mark

Deutz Engine Maintenance Procedure:

Check mark

Sign off on the Deutz Engine Maintenance

Run this procedureArrow right

1 Daily Kubota Engine Maintanance

Check mark

Daily Maintenance Tasks

Check mark

Sign off on the daily maintenance

Run this procedureArrow right

3 Monthly Primary Boom Angle Sensor Test

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Ensure the turntable level sensor and secondary boom angle sensor have been tested before starting this procedure.

Check mark

A digital level will be required to perform this procedure.

Check mark

Perform this procedure with the machine on a firm, level surface with the booms in the fully stowed position and the axles fully extended.

Check mark

Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls.

Check mark

Start the engine from the ground controls.

Check mark

Press the enter or previous button on the LCD screen until PRIMARY BOOM ANGLE TO GRAVITY DEGREES is displayed.

Check mark

Place a digital level that has been calibrated to gravity on top of the primary boom.

Check mark

Raise the primary boom while watching the display screen.

Run this procedureArrow right

1 Yearly Platform Overload Mechanism Lubrication

Check mark

- Grease the Platform Overload Mechanism (if equipped)

Check mark

Perform this procedure more often if dusty conditions exist

Check mark

Application of lubrication to the platform overload mechanism is essential to safe machine operation. Continued use of an improperly greased platform overload mechanism could result in the system not sensing an overloaded platform condition and will result in component damage

Check mark

This maintenance procedure does not apply to the following models: S-80 XC, S-85 XC, SX-125 XC, SX-135 XC, Z-45 XC

Check mark

1. Locate the grease fittings on each pivot pin of the platform overload assembly

Check mark

2. Thoroughly pump grease into each grease fitting

Check mark

3. Grease Specification

Check mark

Chevron Ultra-duty grease, EP NLGI 1 (lithium based) or equivalent;

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z45/25J DC

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets