

The Genie Articulated Boom Lift Z45/25J DC is a versatile and reliable aerial work platform designed for efficient operation in various industrial applications. Known for its exceptional reach and maneuverability, this boom lift ensures safety and productivity on job sites, making it a preferred choice among professionals.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Genie Articulated Boom Lift Z45/25J DC
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Deutz Engine Maintanance
Daily Deutz Engine Maintenance Tasks
Sign off on the daily Deutz engine maintenance
3 Monthly Safety Envelope Limit Switches And Angle Sensor Check
- Check the Safety Envelope Limit Switches and Angle Sensor - S-60X, S-60XC and S-80X
Testing the safety envelope system regularly is essential to safe machine operation. Continued use of an improperly operating safety envelope could result in the system not restricting the range of motion. Machine stability could be compromised resulting in the machine tipping over
Note: Perform this procedure with the machine on a firm, level surface with all weight, tools and equipment removed from the platform
Note: Start this procedure with the boom fully retracted and in the stowed position
Ground controls:
1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position
2. Start the engine from the ground controls
3. Turn and hold the function enable switch to the restricted maximum platform capacity and raise the primary boom until it is fully elevated
4. Extend the primary boom until it is fully extended
1 Yearly Extendable Axle Inspection
Warning: This procedure requires trained personnel with PPE!
Start the engine from the platform controls and extend the axles
Measure each axle wear pad
Replace any wear pad if it is less than specification. If a wear pad is not less than specification, shim as necessary to obtain minimum clearance and no drag
Extend and retract the axles through the entire range of motion to check for tight spots that may cause binding or scraping of the axle tubes
Note: Always maintain squareness between the outer and inner axle tubes
Extendable axle wear pad Wear pad specifications : Minimum 0.4375 inch / 11.11 mm
Sign off on the axle inspection
2000 Hourly Extendable Axle Wear Pads Check
Maintaining the axle wear pads in good condition is essential to safe machine operation. Wear pads are placed on axle tube surfaces to provide a low friction, replaceable wear pad between moving parts. Improperly shimmed wear pads or continued use of worn out wear pads may result in component damage and unsafe operating conditions
Be sure that the axles are fully extended before attempting this procedure
Measure each wear pad
Is the wear pad less than 0.437 inch/1.12 mm?
If a wear pad is not less than specification, shim as necessary to obtain minimum clearance and no drag
If the wear pads are still within specification, refer to Repair Procedure in the appropriate Service and Repair Manual for your machine, How to Shim the Extendable Axles.
If any wear pads are replaced, refer to Repair Procedure in the appropriate Service and Repair Manual for your machine, Grease the Extendable Axles
Extend and retract the axles through the entire range of motion to check for tight spots that may cause binding or scraping of the axle tubes
Always maintain squareness between the outer and inner axle tubes
1 Yearly Turntable Bearing Inspection
Warning: Perform this procedure with the machine on a firm, level surface with the boom in the stowed position.
Grease the turntable bearing. Refer to Maintenance Procedure, Grease the Turntable Bearing and Rotate Gear
Torque the turntable bearing bolts to specification. Refer to Maintenance Procedure, Check the Turntable Rotation Bearing Bolts
Raise the boom to full height using the ground controls. Do not extend the boom.
Place a dial indicator between the drive chassis and the turntable at a point that is directly under, or inline with, the boom and no more than 1 inch / 2.5 cm from the bearing
Adjust the dial indicator needle to the 'zero' position
Lower the boom to a horizontal position and fully extend the boom
Enter the reading on the dial indicator
Move the booms to the positions indicated in step 3. Visually inspect the dial indicator to be sure the needle returns to the 'zero' position
Access the parts list for your equipment in MaintainX.
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













