

The Genie Articulated Boom Lift Z45/25J is a versatile and reliable aerial work platform designed for efficient operation in various industrial applications. Known for its exceptional reach and maneuverability, this boom lift ensures safety and productivity on job sites, making it an essential asset for construction and maintenance tasks.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Genie Articulated Boom Lift Z45/25J
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Safety Envelope Limit Switch Test
- Test the Safety Envelope Limit Switches, Z-135/70, ZX-135/70, SX-105 XC, SX-125 XC, SX-135 XC, SX-150 and SX-180 Models
Testing the machine envelope safety limit switches is critical to safe machine operation. If the boom is allowed to operate when a safety switch is not functioning correctly, the machine stability could be compromised and may tip over
Note: Perform this procedure with the boom in the stowed position
Note: Perform this procedure with the axles extended
Note: Two people will be required to perform this procedure
Note: Use the following chart to identify the description of each LCD screen control button used in this procedure
Z-135/70 and ZX-135/70 Models:
Secondary Boom #1 Retracted Safety Limit Switch, LSS1RS
1. Working at the platform end of the turntable, support and secure the lower turntable riser end cover to a suitable lifting device
Initial 50 Hours Boom Lift Maintenance
Inspect the Tires, Wheels and Lug Nut Torque
Grease the Turntable Rotation Bearing and Rotate Gear
Check the Turntable Rotation Bearing Bolts
Replace the Drive Hub Oil
Replace the Hydraulic Filters
Sign off on the boom lift maintenance
3 Monthly Platform Self-Leveling Test
Test the Platform Self-leveling
Lower the boom to the stowed position at the ground controls
Activate function enable and adjust the platform to a level position
Raise and lower the primary boom through a full cycle
Enter the platform level in degrees
The platform remained level at all times to within +/-5 degrees
Sign off on the platform self-leveling test
3 Monthly Generator Belts Inspection
WARNING! Bodily injury hazard. Do not inspect while the engine is running. Remove the key to secure from operation
CAUTION! Bodily injury hazard. Beware of hot engine components. Contact with hot engine components may cause severe burns
Note: Charging the batteries with the engine does not fully charge the batteries. Periodically, use the AC battery charger to fully charge the batteries
All fasteners and cables on the generator are tight
Engine flywheel cover mounting fasteners removed
Pulley mounting fasteners are tight and pulleys show no signs of damage or unusual wear
Engine pulley and the generator pulley are aligned within specification using a straightedge
Pulley alignment, maximum offset: 0.0625 inch / 1.58 mm
Inspect the generator belts for
2000 Hourly / 3 Monthly Hydraulic Oil Maintenance
Hydraulic Oil Inspection
Visual inspection of the hydraulic oil color: should be a clear, light-honey colored
Visual inspection of the hydraulic oil appearance: should be clear and not cloudy or visibly distorts the view through the sight glass or container
Visual inspection of the hydraulic oil contamination: should contain no particles, foreign objects, or other contamination
Smell test of the hydraulic oil: can smell 'hot' but not 'burnt'
Feel test of the hydraulic oil: should feel viscous and free of any rough feel due to particles
If the hydraulic oil fails any of the above inspections, the hydraulic oil must be tested by an oil distributor or replaced
Note: If the hydraulic oil was not replaced at or before the 2000 hour maintenance interval, the oil must be tested every quarter by an oil distributor until the oil fails the test and is replaced
After the oil has been replaced, continue the scheduled quarterly maintenance inspection
Access the parts list for your equipment in MaintainX.
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













