MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z45/25J

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z45/25J
Genie Articulated Boom Lift Z45/25J

The Genie Articulated Boom Lift Z45/25J is a versatile and reliable aerial work platform designed for efficient operation in various industrial applications. Known for its exceptional reach and maneuverability, this boom lift ensures safety and productivity on job sites, making it an essential asset for construction and maintenance tasks.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z45/25J

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z45/25J

Genie Articulated Boom Lift Z45/25J

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z45/25J

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Safety Envelope Limit Switch Test

Check mark

- Test the Safety Envelope Limit Switches, Z-135/70, ZX-135/70, SX-105 XC, SX-125 XC, SX-135 XC, SX-150 and SX-180 Models

Check mark

Testing the machine envelope safety limit switches is critical to safe machine operation. If the boom is allowed to operate when a safety switch is not functioning correctly, the machine stability could be compromised and may tip over

Check mark

Note: Perform this procedure with the boom in the stowed position

Check mark

Note: Perform this procedure with the axles extended

Check mark

Note: Two people will be required to perform this procedure

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure

Check mark

Z-135/70 and ZX-135/70 Models:

Check mark

Secondary Boom #1 Retracted Safety Limit Switch, LSS1RS

Check mark

1. Working at the platform end of the turntable, support and secure the lower turntable riser end cover to a suitable lifting device

Run this procedureArrow right

Initial 50 Hours Boom Lift Maintenance

Check mark

Inspect the Tires, Wheels and Lug Nut Torque

Check mark

Grease the Turntable Rotation Bearing and Rotate Gear

Check mark

Check the Turntable Rotation Bearing Bolts

Check mark

Replace the Drive Hub Oil

Check mark

Replace the Hydraulic Filters

Check mark

Sign off on the boom lift maintenance

Run this procedureArrow right

3 Monthly Platform Self-Leveling Test

Check mark

Test the Platform Self-leveling

Check mark

Lower the boom to the stowed position at the ground controls

Check mark

Activate function enable and adjust the platform to a level position

Check mark

Raise and lower the primary boom through a full cycle

Check mark

Enter the platform level in degrees

Check mark

The platform remained level at all times to within +/-5 degrees

Check mark

Sign off on the platform self-leveling test

Run this procedureArrow right

3 Monthly Generator Belts Inspection

Check mark

WARNING! Bodily injury hazard. Do not inspect while the engine is running. Remove the key to secure from operation

Check mark

CAUTION! Bodily injury hazard. Beware of hot engine components. Contact with hot engine components may cause severe burns

Check mark

Note: Charging the batteries with the engine does not fully charge the batteries. Periodically, use the AC battery charger to fully charge the batteries

Check mark

All fasteners and cables on the generator are tight

Check mark

Engine flywheel cover mounting fasteners removed

Check mark

Pulley mounting fasteners are tight and pulleys show no signs of damage or unusual wear

Check mark

Engine pulley and the generator pulley are aligned within specification using a straightedge

Check mark

Pulley alignment, maximum offset: 0.0625 inch / 1.58 mm

Check mark

Inspect the generator belts for

Run this procedureArrow right

2000 Hourly / 3 Monthly Hydraulic Oil Maintenance

Check mark

Hydraulic Oil Inspection

Check mark

Visual inspection of the hydraulic oil color: should be a clear, light-honey colored

Check mark

Visual inspection of the hydraulic oil appearance: should be clear and not cloudy or visibly distorts the view through the sight glass or container

Check mark

Visual inspection of the hydraulic oil contamination: should contain no particles, foreign objects, or other contamination

Check mark

Smell test of the hydraulic oil: can smell 'hot' but not 'burnt'

Check mark

Feel test of the hydraulic oil: should feel viscous and free of any rough feel due to particles

Check mark

If the hydraulic oil fails any of the above inspections, the hydraulic oil must be tested by an oil distributor or replaced

Check mark

Note: If the hydraulic oil was not replaced at or before the 2000 hour maintenance interval, the oil must be tested every quarter by an oil distributor until the oil fails the test and is replaced

Check mark

After the oil has been replaced, continue the scheduled quarterly maintenance inspection

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z45/25J

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets