The Genie Articulated Boom Lift Z-40/23N is a versatile and reliable aerial work platform designed for various industrial applications. Known for its exceptional reach and maneuverability, this boom lift ensures safety and efficiency on job sites, making it a preferred choice for contractors and maintenance professionals.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Genie Articulated Boom Lift Z-40/23N
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Platform Load Sense System Test
Warning: This procedure requires trained personnel with PPE!
Ensure no load sense system faults exist prior to performing this procedure
On a properly functioning machine, the LEDs on both control modules, located next to the ground control box, should be off
All weight, tools, accessories and equipment removed from the platform?
Key switch turned to ground control and red Emergency Stop button pulled out to the on position at both ground and platform controls?
Engine started from the ground controls?
Enter the weight of the test weight placed on the center of the platform floor
Did the amber restricted range of motion LED at the platform controls come on and the engine continued to run?
Enter the total weight in the platform after placing additional test weight
2000 Hourly Engine Maintenance
- Perform Engine Maintenance
Required maintenance procedures and additional engine information are available in the manufacturer's manuals. Refer to Specifications, Engine Operator and Maintenance Manuals
Cummins Models:
• Cooling system - flush
• Valve clearance - check/adjust
GM .998L:
• Spark plug wires - replace
• Timing belt - replace
• Bolts, nuts and fasteners - check/tighten
3 Monthly Drive Speed Test
- Test the Drive Speed - Stowed Position
Note: Perform this procedure with the machine on a firm, level surface that is free of obstructions
Note: Perform this procedure with the machine in the stowed position
1. Create start and finish lines by marking two lines on the ground 40 feet / 12.2 m apart
2. Choose a point on the machine (i.e., contact patch of a tire) as a visual reference for use when crossing the start and finish lines
3. Bring the machine to top drive speed before reaching the start line. Begin timing when your reference point on the machine crosses the start line
4. Continue at full speed and note the time when the machine reference point crosses the finish line. Refer to Specifications, Drive Speed Specifications
- Test the Drive Speed - Raised or Extended Position
1. Create start and finish lines by marking two lines on the ground 40 feet / 12.2 m apart
1 Daily GM 3.0L Engine Maintanance
Clean radiator
Drain/clean LPG vaporizer
Clean/replace air cleaner element
Replace engine oil and filter
Replace fuel filter
Replace air filter
Replace distributor cap
Replace spark plug wires
Sign off on the daily maintenance
3 Monthly Safety Envelope Limit Switch Test
- Test the Safety Envelope Limit Switches, Z-135/70, ZX-135/70, SX-105 XC, SX-125 XC, SX-135 XC, SX-150 and SX-180 Models
Testing the machine envelope safety limit switches is critical to safe machine operation. If the boom is allowed to operate when a safety switch is not functioning correctly, the machine stability could be compromised and may tip over
Note: Perform this procedure with the boom in the stowed position
Note: Perform this procedure with the axles extended
Note: Two people will be required to perform this procedure
Note: Use the following chart to identify the description of each LCD screen control button used in this procedure
Z-135/70 and ZX-135/70 Models:
Secondary Boom #1 Retracted Safety Limit Switch, LSS1RS
1. Working at the platform end of the turntable, support and secure the lower turntable riser end cover to a suitable lifting device
Access the parts list for your equipment in MaintainX.
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX