MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z-40/23N

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z-40/23N
Genie Articulated Boom Lift Z-40/23N

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z-40/23N

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z-40/23N

Genie Articulated Boom Lift Z-40/23N

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z-40/23N

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Engine Maintenance

Check mark

- Check and Adjust the Engine RPM

Check mark

Note: These procedures do not apply to the following engine models. The engine RPM is controlled by the ECM and can only be adjusted by re-programming the ECM. If RPM or service is required, please contact Genie Product Support

Check mark

GM Models: .998L • 3.0L

Check mark

Continental Models: TME27

Check mark

Ford Models: DSG-423 • MSG-425

Check mark

Deutz Models: D 2.9 L4 • TD 2.9 L4 • D436 Li CN3

Check mark

Perkins Models: 403F-11 • 404D-22T • 404F-22 • 404F-22T • 854F-34T

Check mark

Note: Some procedures may require two people

Check mark

Note: For engine RPM information refer to Specifications, Engine Specifications for your engine model

Run this procedureArrow right

2000 Hourly Engine Maintenance

Check mark

- Perform Engine Maintenance

Check mark

Required maintenance procedures and additional engine information are available in the manufacturer's manuals. Refer to Specifications, Engine Operator and Maintenance Manuals

Check mark

Cummins Models:

Check mark

• Cooling system - flush

Check mark

• Valve clearance - check/adjust

Check mark

GM .998L:

Check mark

• Spark plug wires - replace

Check mark

• Timing belt - replace

Check mark

• Bolts, nuts and fasteners - check/tighten

Run this procedureArrow right

1 Yearly Jib Rotate Bearing Maintenance

Check mark

- Perform Maintenance – Jib Rotate Bearing - SX-150 and SX-180

Check mark

Periodic inspection of jib bearing wear is essential to safe machine operation, good machine performance and service life. Continued use of a worn jib bearing could create an unsafe operating condition, resulting in death or serious injury and component damage

Check mark

Note: Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface

Check mark

1. Check the Jib Rotator Fastener torque

Check mark

2. Using a star pattern, confirm that each jib rotator outer mounting bolt is torqued in sequence to specification. Repeat the procedure for the inner mounting bolts

Check mark

Jib boom rotate bearing bolts: 200 ft-Ibs/ 271 Nm

Check mark

Grease the Jib Rotator

Check mark

3. While rotating the jib, pump grease into each bearing lubricating grease fitting until fresh grease is visible at the outer seal

Check mark

4. While rotating the jib, pump grease into the worm gear grease fitting until fresh grease is visible at one sealing lip or bearing cap

Run this procedureArrow right

Initial 150 Hours Hydraulic Filter Maintenance

Check mark

Visual Inspection of the Hydraulic Oil

Check mark

Inspect the Hydraulic Filters

Check mark

After performing maintenance, perform scheduled services

Check mark

Sign off on the hydraulic filter maintenance

Run this procedureArrow right

1 Yearly Dual Capacity And Platform Overload System S-models Test

Check mark

- Test the Dual Capacity and Platform Overload System - SX-105 XC, SX-125 XC and SX-135 XC Models Genie specifications require that this procedure be performed annually OR when the machine fails to lift the maximum rated load

Check mark

Testing the platform overload system regularly is essential to safe machine operation. Continued use of an improperly operating platform overload system could result in the system not sensing an overloaded platform condition. Machine stability could be compromised resulting in the machine tipping over

Check mark

Note: Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface

Check mark

1. Remove all weight, tools, accessories and equipment from the platform

Check mark

Note: Failure to remove all weight, tools and accessories from the platform will result in an inaccurate test

Check mark

2. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Check mark

3. Using a suitable lifting device, place a test weight of 600 lbs / 272kg in the center of the platform. Secure the weight to the platform

Check mark

Note: The test weight may be within -0% / +5%

Check mark

Result: The unrestricted range of motion indicator light is on at ground controls

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z-40/23N

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets