MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z-34

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z-34
Genie Articulated Boom Lift Z-34

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z-34

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z-34

Genie Articulated Boom Lift Z-34

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z-34

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Platform Overload System Test

Check mark

Warning: This procedure requires trained personnel. Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface.

Check mark

Remove all weight, tools, accessories and equipment from the platform.

Check mark

Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both the ground and platform controls.

Check mark

Start the engine from the ground controls and level the platform. Do not turn the engine off.

Check mark

Determine the maximum platform capacity. Refer to the machine serial plate.

Check mark

Using a suitable lifting device, place a test weight equal to that of the available capacity in one of the locations shown.

Check mark

The platform overload indicator lights should be off at both the ground and platform controls, the alarm should not sound and the engine should continue to run.

Check mark

Carefully move the test weights to each remaining location on the platform.

Check mark

The platform overload indicator lights should be off at both the ground and platform controls, the alarm should not sound and the engine should continue to run.

Run this procedureArrow right

1 Daily Perkins Engine Maintanance

Check mark

Daily Maintenance Tasks

Check mark

Sign off on the daily maintenance

Run this procedureArrow right

50 Hourly Extendable Axles Lubrication

Check mark

Warning: This procedure should be performed every 50 hours as per manufacturer specifications

Check mark

Locate the grease fittings on the extendable axles covers

Check mark

Pump grease into each grease fitting

Check mark

Note: When grease is pumped into each fitting, a hose directs this lubrication to the top or bottom wear pad

Check mark

Cycle the extending axles in and out

Check mark

Note: Genie recommends that the extending axles be cycled in and out at least once a week

Check mark

Sign off on the axle lubrication

Run this procedureArrow right

1 Yearly Jib Rotate Bearing Maintenance

Check mark

Warning: Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface

Check mark

Check the Jib Rotator Fastener torque

Check mark

Confirm that each jib rotator outer mounting bolt is torqued in sequence to specification

Check mark

Repeat the procedure for the inner mounting bolts

Check mark

Jib boom rotate bearing bolts: 200 ft-Ibs/ 271 Nm

Check mark

While rotating the jib, pump grease into each bearing lubricating grease fitting until fresh grease is visible at the outer seal

Check mark

While rotating the jib, pump grease into the worm gear grease fitting until fresh grease is visible at one sealing lip or bearing cap

Check mark

Place a 750 lb / 340 kg weight in the platform and raise the jib until it is horizontal and parallel with the boom

Check mark

Place the dial indicator on the side of the rotator bearing housing and measure the bearing as shown in illustration 2

Run this procedureArrow right

1 Yearly Turntable Bearing Inspection

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Perform this procedure with the machine on a firm, level surface with the boom in the stowed position

Check mark

Grease the turntable bearing

Check mark

Torque the turntable bearing bolts to specification

Check mark

Raise the boom to full height using the ground controls

Check mark

Place a dial indicator between the drive chassis and the turntable at a point that is directly under, or inline with, the boom and no more than 1 inch / 2.5 cm from the bearing

Check mark

Adjust the dial indicator needle to the 'zero' position

Check mark

Lower the boom to a horizontal position and fully extend the boom

Check mark

Reading on the dial indicator

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z-34

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets