Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Genie Articulated Boom Lift Z-34
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Platform Overload System Test
Warning: This procedure requires trained personnel. Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface.
Remove all weight, tools, accessories and equipment from the platform.
Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both the ground and platform controls.
Start the engine from the ground controls and level the platform. Do not turn the engine off.
Determine the maximum platform capacity. Refer to the machine serial plate.
Using a suitable lifting device, place a test weight equal to that of the available capacity in one of the locations shown.
The platform overload indicator lights should be off at both the ground and platform controls, the alarm should not sound and the engine should continue to run.
Carefully move the test weights to each remaining location on the platform.
The platform overload indicator lights should be off at both the ground and platform controls, the alarm should not sound and the engine should continue to run.
1 Daily Perkins Engine Maintanance
Daily Maintenance Tasks
Sign off on the daily maintenance
50 Hourly Extendable Axles Lubrication
Warning: This procedure should be performed every 50 hours as per manufacturer specifications
Locate the grease fittings on the extendable axles covers
Pump grease into each grease fitting
Note: When grease is pumped into each fitting, a hose directs this lubrication to the top or bottom wear pad
Cycle the extending axles in and out
Note: Genie recommends that the extending axles be cycled in and out at least once a week
Sign off on the axle lubrication
1 Yearly Jib Rotate Bearing Maintenance
Warning: Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface
Check the Jib Rotator Fastener torque
Confirm that each jib rotator outer mounting bolt is torqued in sequence to specification
Repeat the procedure for the inner mounting bolts
Jib boom rotate bearing bolts: 200 ft-Ibs/ 271 Nm
While rotating the jib, pump grease into each bearing lubricating grease fitting until fresh grease is visible at the outer seal
While rotating the jib, pump grease into the worm gear grease fitting until fresh grease is visible at one sealing lip or bearing cap
Place a 750 lb / 340 kg weight in the platform and raise the jib until it is horizontal and parallel with the boom
Place the dial indicator on the side of the rotator bearing housing and measure the bearing as shown in illustration 2
1 Yearly Turntable Bearing Inspection
Warning: This procedure requires trained personnel with PPE!
Perform this procedure with the machine on a firm, level surface with the boom in the stowed position
Grease the turntable bearing
Torque the turntable bearing bolts to specification
Raise the boom to full height using the ground controls
Place a dial indicator between the drive chassis and the turntable at a point that is directly under, or inline with, the boom and no more than 1 inch / 2.5 cm from the bearing
Adjust the dial indicator needle to the 'zero' position
Lower the boom to a horizontal position and fully extend the boom
Reading on the dial indicator
Access the parts list for your equipment in MaintainX.
Digital Level Kit
58351
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
O-ring Field Service Kit
49612
Digital Level Kit
58351
Digital Protractor
58377
O-ring Field Service Kit
49612
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX