

The Genie Articulated Boom Lift S-80X 2WD is a versatile and powerful aerial work platform designed for various industrial applications. Known for its exceptional reach and maneuverability, this boom lift is ideal for construction, maintenance, and repair tasks, ensuring safety and efficiency on the job site.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Genie Articulated Boom Lift S-80X 2WD
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Platform Overload System Test
This procedure applies to the following models: S-40, S-45, S-60, S-65, S-80, S-85, Z-45/25 (J), Z-51/30J, Z-30/20N (RJ), Z-34/22, Z-34/22 (N), Z-34/22 IC, Z-40/23N (RJ), Z-45/25 (J) DC, 2-45/25 (J) Bi-Energy, Z-60 DC/FE, Z-62/40 and models equipped with the 340 kg capacity option
Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface
Remove all weight, tools, accessories and equipment from the platform
Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both the ground and platform controls. Start the engine from the ground controls and level the platform. Do not turn the engine off
Determine the maximum platform capacity
Using a suitable lifting device, place a test weight equal to that of the available capacity in one of the locations shown
Carefully move the test weights to each remaining location on the platform
Add additional weight to the platform that is equal to, but does not exceed 15% of the maximum rated load. Secure the additional weight
Carefully move the test weights to each remaining location on the platform
2000 Hourly Hydraulic Oil Maintenance
Warning: This maintenance check requires trained personnel with PPE!
Hydraulic oil test passed?
If hydraulic oil test failed, proceed to replace the hydraulic oil.
Replacing the hydraulic oil:
Drain plug from the hydraulic tank removed?
Hydraulic tank completely drained into a suitable container?
Enter the amount of hydraulic oil filled into the tank
Pump primed?
Clean up and proper disposal of any spilled oil?
3 Monthly Boom Lift Maintenance
- Check for Open Bulletins and Owner Registration
1. Locate the serial number plate or label on your machine and document your Genie machine serial number (exactly as its displayed on the serial plate or label)
2. Confirm that Genie has the current machine owner information on file by contacting our warranty department at 1-800-536-1800 or use the link included in this procedure to download and complete a New Owner Registration Form
3. Using the link provided, check for current bulletins for your machine(s);
3 Monthly Generator Belts Inspection
- Check the Generator Belts, Pulleys and Voltage - Bi-Energy Models
WARNING!
Bodily injury hazard. Do not inspect while the engine is running. Remove the key to secure from operation
CAUTION!
Bodily injury hazard. Beware of hot engine components
Contact with hot engine components may cause severe burns
Note: Charging the batteries with the engine does not fully charge the batteries. Periodically, use the AC battery charger to fully charge the batteries
1. Be sure that all fasteners and cables on the generator are tight
2. Remove the engine flywheel cover mounting fasteners, then remove the cover
3 Monthly Emergency Power System Test
- Test the Emergency Power System (excludes ALC-600 and ALC-1000 Models)
1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both the ground and platform controls
2. At the ground controls, break the security tie and lift the emergency power switch cover (if equipped)
3. Simultaneously hold the emergency power switch on and operate each boom function through a partial cycle
• Result: All boom functions operate
4. Close the emergency power switch cover and secure the cover with a security tie (if equipped)
5 Turn the key switch to platform controls
6. At the platform controls, break the security tie and lift the emergency power switch cover (if equipped). 7. Press down on the foot switch and simultaneously hold the emergency power switch on and operate each boom function through a partial cycle
• Result: All boom functions operate
Access the parts list for your equipment in MaintainX.
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













