

The Fanuc Palletizer Robot M-410iC/185 is a highly efficient industrial automation solution designed for palletizing tasks. This versatile robot offers exceptional speed and precision, making it ideal for various manufacturing environments. With advanced features and reliable performance, the M-410iC/185 enhances productivity and operational efficiency in palletizing applications.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Fanuc Palletizer Robot M-410iC/185
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
11520 Hourly / 3 Yearly Drive Mechanism Lubrication
Warning: Hot grease might eject suddenly when you open the grease outlet. Use appropriate protective equipment such as heat-resistant gloves, protective glasses, a face shield, or a body suit if necessary
For grease replacement or replenishment, use the postures indicated below
Choose the type of axis reducer
Enter the amount of grease used in grams
Note: In a high-duty environment where, for example, a cooling unit (fan) is used, grease must be replaced every half the specified standard period
Caution: Failure to follow proper greasing procedures may cause a sudden increase of the grease bath internal pressure and damage to the seal. This could lead to grease leakage and abnormal operation.
Did you remove the seal bolt or the taper plug to allow the grease to come out before starting to grease?
Did you supply grease slowly without applying excessive force, using a manual pump?
Did you avoid using a compressed-air pump, powered by the factory air supply?
11520 Hourly / 3 Yearly J3 Arm Lubrication
Warning: This procedure requires trained personnel with PPE!
Is the J3 arm connection part bearing ready for greasing?
If not, report the issues to the maintenance team and stop the procedure
Choose the type of grease used
Enter the amount of grease supplied (in ml)
Was the old grease wiped off immediately after greasing?
Was the seal bolt sealed with seal tape after greasing?
Sign off on the J3 arm lubrication
11520 Hourly / 3 Yearly J3 Base Lubrication
Warning: This procedure requires trained personnel with PPE!
Supply grease to the J3 base connection part bearing
Adjust the greasing timing if your robot is installed in an adverse environment. Supply grease immediately if water is splashed on the robot
Remove the seal bolt in Fig. 7.3.1 (b), (c) before greasing
Seal the bolt with seal tape if reused
Choose the grease used
NOTE: After grease is supplied, old grease is pushed out from the bearing's rotating section. Wipe off the old grease immediately after greasing and, as required, after operations of 50 to 100 hours.
If the robot is high-duty, requiring a cooling unit (fan), shorten the standard greasing cycle to half
Sign off on the J3 base lubrication
11520 Hourly / 3 Yearly Wrist Connection Lubrication
Warning: This procedure requires trained personnel with PPE!
Enter the cumulative operation time of the robot
Enter the last lubrication date
Is the robot installed in an adverse environment?
Has water been splashed on the robot?
If yes, supply grease immediately
Upload a photo of the greasing points of the bearings
Did you remove the seal bolt before greasing?
Select the type of grease used
15360 Hourly / 4 Yearly Robot Parts Replacement
Mechanical unit cable replaced
Contact information of local FANUC representative
Controller batteries replaced
Sign off on the parts replacement
Access the parts list for your equipment in MaintainX.
Brake Release Unit (Input Voltage AC100-115V Single Phase)
A05B-2450-J350
Brake Release Unit (Input Voltage AC200-240V Single Phase)
A05B-2450-J351
Code pin, ARM
09 30 000 9901
Code pin, ARP
09 30 000 9901
Connector AS Input Side (J1 Base)
A63L-0001-0234#W2524M
Brake Release Unit (Input Voltage AC100-115V Single Phase)
A05B-2450-J350
Brake Release Unit (Input Voltage AC200-240V Single Phase)
A05B-2450-J351
Code pin, ARM
09 30 000 9901
Code pin, ARP
09 30 000 9901
Connector AS Input Side (J1 Base)
A63L-0001-0234#W2524M
Brake Release Unit (Input Voltage AC100-115V Single Phase)
A05B-2450-J350
Brake Release Unit (Input Voltage AC200-240V Single Phase)
A05B-2450-J351
Code pin, ARM
09 30 000 9901
Code pin, ARP
09 30 000 9901
Connector AS Input Side (J1 Base)
A63L-0001-0234#W2524M
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













