MaintainX Asset Hub logo
EnterprisePricing
Fanuc

Fanuc Palletizer Robot M-410iC/500

Need answers fast?
Explore the manual using AI.

Fanuc Palletizer Robot M-410iC/500
Fanuc Palletizer Robot M-410iC/500

The Fanuc Palletizer Robot M-410iC/500 is a high-performance industrial robot designed for efficient palletizing operations. Known for its reliability and precision, this model enhances productivity in manufacturing environments, making it an ideal choice for automated material handling solutions.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Fanuc Palletizer Robot M-410iC/500

Fanuc Palletizer Robot M-410iC/500

Create an account to install this asset package.

Maintenance Plans for Fanuc Palletizer Robot Model M-410iC/500

Integrate maintenance plans directly into your work orders in MaintainX.

11520 Hourly / 3 Yearly Drive Mechanism Lubrication

Check mark

Warning: Hot grease might eject suddenly when you open the grease outlet. Use appropriate protective equipment such as heat-resistant gloves, protective glasses, a face shield, or a body suit if necessary

Check mark

For grease replacement or replenishment, use the postures indicated below

Check mark

In a high-duty environment where, for example, a cooling unit (fan) is used, grease must be replaced every half the specified standard period

Check mark

Failure to follow proper greasing procedures may cause a sudden increase of the grease bath internal pressure and damage to the seal. This could lead to grease leakage and abnormal operation.

Check mark

Be careful not to confuse the grease inlet of the J4-axis reducer with the grease inlet of the wrist link bearing because they are close to each other

Check mark

Removed the seal bolt or the taper plug to allow the grease to come out

Check mark

Supplied grease slowly without applying excessive force, using a manual pump

Check mark

Avoided using a compressed-air pump, powered by the factory air supply

Check mark

Used grease only of the specified type

Run this procedureArrow right

11520 Hourly / 3 Yearly J3 Arm Lubrication

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Supply grease to the J3 arm connection part bearing

Check mark

Supply grease to the machine at the timing (cumulative operation time or period whichever earlier) specified in Table 7.3.1 (a) to (b)

Check mark

Adjust the greasing timing if your robot is installed in an adverse environment. Supply grease immediately if water is splashed on the robot

Check mark

Fig. 7.3.1 (b) to (f) indicate the greasing points of the bearings. When greasing the bearing of the J3 arm connection part, remove the seal bolt in Fig. 7.3.1 (b), (c) before greasing. If the seal bolt is reused, be sure to seal it with seal tape

Check mark

Recommended grease of the bearing: J3 arm connecting position bearing greasing point Showa Shell Sekiyu K. K. SHELL ALVANIA GREASE S2 (Spec.: A98L-0004-0602#CTG) 20 ml for each (Two points) 3 yearly or every 11520 hours of accumulated operating time whichever comes first

Check mark

NOTE: 1. After grease is supplied, old grease is pushed out from the bearing's rotating section. Wipe off the old grease immediately after greasing and, as required, after operations of 50 to 100 hours. 2. If the robot is high-duty, requiring a cooling unit (fan), shorten the standard greasing cycle to half

Check mark

Select the substitute for ALVANIA GREASE S2

Check mark

Seal bolt (M6 x 8) A97L-0218-0417#060808

Run this procedureArrow right

11520 Hourly / 3 Yearly J3 Base Lubrication

Check mark

Supply grease to the J3 base connection part bearing

Check mark

Grease supplied at the specified timing?

Check mark

Is the robot installed in an adverse environment?

Check mark

If yes, adjust the greasing timing. Supply grease immediately if water is splashed on the robot

Check mark

Fig. 7.3.1 (b) to (f) indicate the greasing points of the bearings

Check mark

Seal bolt removed before greasing?

Check mark

Seal bolt sealed with seal tape if reused?

Check mark

Recommended grease: SHELL ALVANIA GREASE S2

Check mark

Enter the amount of grease used (in ml)

Run this procedureArrow right

11520 Hourly / 3 Yearly Wrist Connection Lubrication

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Enter the cumulative operation time of the robot

Check mark

Is the robot installed in an adverse environment?

Check mark

Has water been splashed on the robot?

Check mark

If water has been splashed on the robot, supply grease immediately

Check mark

Seal bolt removed before greasing?

Check mark

Seal bolt sealed with seal tape after greasing?

Check mark

Select the grease used

Check mark

Note: After grease is supplied, old grease is pushed out from the bearing's rotating section. Wipe off the old grease immediately after greasing and, as required, after operations of 50 to 100 hours.

Run this procedureArrow right

15360 Hourly / 4 Yearly Robot Parts Replacement

Check mark

Warning: This procedure requires trained personnel!

Check mark

Mechanical unit cable replaced

Check mark

Contact information of local FANUC representative

Check mark

Controller batteries replaced

Check mark

Sign off on the parts replacement

Run this procedureArrow right

Parts for Fanuc Palletizer Robot M-410iC/500

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Brake Release Unit (Input Voltage AC100-115V Single Phase)

A05B-2450-J350

Brake Release Unit (Input Voltage AC200-240V Single Phase)

A05B-2450-J351

Code pin, ARM

09 30 000 9901

Code pin, ARP

09 30 000 9901

Connector AS Input Side (J1 Base)

A63L-0001-0234#W2524M

Brake Release Unit (Input Voltage AC100-115V Single Phase)

A05B-2450-J350

Brake Release Unit (Input Voltage AC200-240V Single Phase)

A05B-2450-J351

Code pin, ARM

09 30 000 9901

Code pin, ARP

09 30 000 9901

Connector AS Input Side (J1 Base)

A63L-0001-0234#W2524M

Brake Release Unit (Input Voltage AC100-115V Single Phase)

A05B-2450-J350

Brake Release Unit (Input Voltage AC200-240V Single Phase)

A05B-2450-J351

Code pin, ARM

09 30 000 9901

Code pin, ARP

09 30 000 9901

Connector AS Input Side (J1 Base)

A63L-0001-0234#W2524M

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Fanuc

Explore Other Assets