The Fanuc Robot S-420iR/120 is a versatile industrial robot designed for high-performance automation tasks. Known for its precision and reliability, this model excels in various applications, making it an essential asset for manufacturing processes. Optimize your operations with the advanced capabilities of the Fanuc S-420iR/120.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Fanuc Robot S-420iR/120
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Robot Check
Air pressure in the air regulator
Drop quantity during wrist or hand motion
Oiler level within the specified level
Check joints, tubes, etc. for leaks
Air pressure in the air filter unit
Check element for harsh stains
Check joints, tubes, etc. for leaks
Check if robot moves smoothly without unusual vibration or sounds
Check if the temperature of the motors is excessively high
1 Yearly Robot Check
Battery in the mechanical unit replaced?
Cables in mechanical unit checked?
Each part cleaned and inspected?
Tightness of major external bolts checked?
Balancer joint bearing greased?
Grease supplied to the bearing (only for the S--420i R)?
Filter elements in the air filter unit replaced?
Sign off on the yearly robot check
3 Monthly Robot Check
1) Check the following items once every three months. Additional inspection areas and times should be added to the table according to the robot’s working conditions, environment, etc.
Check whether the cable connected to the teach pendant is unevenly twisted.
If the ventilation portion of the control unit is dusty, tum off power and clean the unit.
2) First quarterly inspection
Check the following items at the first quarterly inspection, then every year thereafter.
Check whether the jackets of the mechanical unit cables are damaged. Also check whether the cables are excessively bent or unevenly twisted. Check that the connectors of the motors and connector panels are securely engaged.See section 7.2.
Clean each part (remove chips, etc.) and check component parts for cracks and flaws.
Further tighten the end--effecter mounting bolts and external main bolts.
Grease to the balancer bushing. Refer to item 3.2. in every 6 month;
3 Yearly Robot Lubrication
Warning: This lubrication process requires trained personnel with PPE!
Grease Replacement
Select the parts where grease was replaced
Cross-Roller Bearing Lubrication
Was the cross-roller bearing greased?
Required Positions for Greasing
Refer to item 3.2 and list the positions where grease was applied
Sign off on the robot lubrication
Filter Element Replacement
Power turned off
Purge air shut off
Air filter's gauge reading
Upload a photo of the replaced filter element
Air filters and oil mist filter replaced at the same time
Sign off on the filter element replacement
Access the parts list for your equipment in MaintainX.
Balancer
A290-7313-V312
Balancer
A290-7313-V302
Balancer
A05B-1313-V311
Balancer
A05B-1313-V301
Battery, 1.5 V, size D
A98L-0031-0005
Balancer
A290-7313-V312
Balancer
A290-7313-V302
Balancer
A05B-1313-V311
Balancer
A05B-1313-V301
Battery, 1.5 V, size D
A98L-0031-0005
Balancer
A290-7313-V312
Balancer
A290-7313-V302
Balancer
A05B-1313-V311
Balancer
A05B-1313-V301
Battery, 1.5 V, size D
A98L-0031-0005
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX