
The Fanuc Robot 200iD is a high-performance industrial robot designed for precision automation tasks. Known for its reliability and versatility, this model excels in various applications, making it an ideal choice for manufacturers seeking efficiency and productivity in their operations.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Fanuc Robot 200iD
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
11520 Hourly / 3 Yearly Robot Maintenance
Check for external damage or peeling paint
Check for water
Check the exposed connector (loosening)
Tighten the end effector bolt
Tighten the cover and main bolt
Check the mechanical stopper
Clean spatters, sawdust and dust
Check hand cable and external battery cable (option)
Replacing battery (if built-in batteries are specified)
15360 Hourly / 4 Yearly Axis Reducer Maintenance
Replenish grease to each axis reducer (Except 7C/7LC)
Controller power turned off?
Seal bolts removed from the grease inlet?
Supply a regulated amount of grease by using the injection syringe. Please note that grease might come out immediately after the grease has been supplied, or during the greasing. Even in this case, please do not supply grease beyond the regulated amount specified.
Grease supplied using the injection syringe?
Seal bolts replaced with new ones? If reusing a seal bolt, be sure to seal it with seal tape.
Replacing the mechanical unit cable
Mechanical unit cable replaced?
Replacing the controller batteries
1920 Hourly / 6 Monthly Robot Maintenance
Check for external damage or peeling paint
Check for water
Clean spatters, sawdust and dust
Cleaning the controller ventilation system
1 Daily Robot Maintenance
Check for oil seepage on the sealed part of each joint
If there is oil seepage, clean it
Check if motors are hot
Check if internal pressure of the grease bath has risen
If you must wipe oil frequently, and opening the grease outlet does not stop the seepage, perform the measures below
Check air pressure using the pressure gauge on the air control set
Check the joints, tubes, etc. for leaks
Check the drain and empty it
Check the supply pressure using the air purge kit
320 Hourly /1 Monthly Robot Maintenance
Check controller ventilation system
Cleaning the controller ventilation system
Confirm that the controller ventilation system is not dusty
If dust has accumulated, remove it.
Sign off on the robot maintenance
Access the parts list for your equipment in MaintainX.
340 Deg Rotation, (standard)
A05B-1142-H057
6 Axes Control, (H005)
A05B-2651-H030
Axes Control Card 6 Axes, (Standard)
A05B-2670-H040
Axis Vernier Mark
A05B-1142-H062
Backplane 2 Slots
A05B-2680-H080
340 Deg Rotation, (standard)
A05B-1142-H057
6 Axes Control, (H005)
A05B-2651-H030
Axes Control Card 6 Axes, (Standard)
A05B-2670-H040
Axis Vernier Mark
A05B-1142-H062
Backplane 2 Slots
A05B-2680-H080
340 Deg Rotation, (standard)
A05B-1142-H057
6 Axes Control, (H005)
A05B-2651-H030
Axes Control Card 6 Axes, (Standard)
A05B-2670-H040
Axis Vernier Mark
A05B-1142-H062
Backplane 2 Slots
A05B-2680-H080
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













