MaintainX Asset Hub logo
EnterprisePricing
DRAEGER

DRAEGER Anesthesia Workstation Primus

Need answers fast?
Explore the manual using AI.

DRAEGER Anesthesia Workstation Primus
DRAEGER Anesthesia Workstation Primus

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

DRAEGER Anesthesia Workstation Primus

DRAEGER Anesthesia Workstation Primus

Create an account to install this asset package.

Maintenance Plans for DRAEGER Anesthesia Workstation Model Primus

Integrate maintenance plans directly into your work orders in MaintainX.

Water Trap Container Removal

Check mark

Water Trap Removal and Emptying

Check mark

Pull the water trap out towards the front

Check mark

Empty the water trap

Check mark

Safety Warning

Check mark

Ensure the water trap has not been used longer than four weeks

Check mark

Disposal Instructions

Check mark

Dispose of the old water trap according to WaterLock instructions

Check mark

Comply with the hospital’s hygiene requirements during disposal

Run this procedureArrow right

Ventilator Diaphragm Removal

Check mark

Diaphragm Removal

Check mark

Remove the upper diaphragm (A)

Check mark

Is the diaphragm removed without damage?

Check mark

Preparation for Conditioning

Check mark

Prepare diaphragm for conditioning in a cleaning and disinfecting machine

Check mark

Ensure diaphragm is not reprocessed with light-colored, transparent silicone components

Run this procedureArrow right

Microbial Filter Removal

Check mark

Filter Removal

Check mark

Pull the filter off the nozzle

Check mark

Filter Conditioning Preparation

Check mark

Prepare the microbial filter for conditioning according to the corresponding instructions for use

Check mark

Post Removal Check

Check mark

Check that the filter has been removed completely

Check mark

Inspect the nozzle for any remaining debris

Check mark

Documentation

Check mark

Record any issues encountered during removal

Run this procedureArrow right

4 Weekly Water Trap Replacement

Check mark

Procedure Description

Check mark

Water Trap Replacement Steps

Check mark

Pull the old water trap off to the front and dispose of it with domestic waste. Observe the hospital's hygiene regulations!

Check mark

Mark the new water trap with the current date. Use the space provided for this purpose.

Check mark

Push the new water trap into place until it engages.

Check mark

Post Replacement Check

Check mark

Is the monitor free of alarm messages after replacement?

Check mark

Check if the new water trap is securely engaged.

Run this procedureArrow right

Sample Line Removal

Check mark

Sample Line Disconnection

Check mark

Unscrew the sample line from the Y-piece

Check mark

Unscrew the sample line from the water trap on the front of the unit

Check mark

Safety Precautions

Check mark

Ensure no gas measurement failure risk

Check mark

Ensure device is not at risk of failure

Check mark

Disposal Instructions

Check mark

Dispose of the sample gas line according to hospital's hygiene regulations

Check mark

Cautionary Notes

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from DRAEGER

Explore Other Assets