MaintainX Logo
EnterprisePricing
Doosan

Doosan Generator G25WMI-2A-T2 (B54)

Need answers fast?
Explore the manual using AI.

Doosan Generator G25WMI-2A-T2 (B54)
Doosan Generator G25WMI-2A-T2 (B54)

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Doosan Generator G25WMI-2A-T2 (B54)

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Doosan Generator G25WMI-2A-T2 (B54)

Doosan Generator G25WMI-2A-T2 (B54)

Create an account to install this asset package.

Maintenance Plans for Doosan Generator Model G25WMI-2A-T2 (B54)

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 20 Hours Alternator Check

Check mark

Safety Measures

Check mark

Servicing or troubleshooting must be carried out strictly in accordance with instructions so as to avoid the risk of accidents and to maintain the machine in its original state.

Check mark

All such operations performed on the alternator should be undertaken by personnel with training of electrical and mechanical components.

Check mark

Before any intervention on the machine, ensure that it cannot be started by a manual or automatic system and that you have understood the operating principles of the system.

Check mark

Enter the current operation hours of the machine

Check mark

All fixing screws on the machine are still tight

Check mark

General state of the machine is satisfactory

Check mark

All electrical connections in the installation are intact

Check mark

Sign off on the alternator check

Run this procedureArrow right

20000 Hourly / 3 Monthly Alternator Bearings Replacement

Check mark

Safety Measures

Check mark

Servicing or troubleshooting must be carried out strictly in accordance with instructions so as to avoid the risk of accidents and to maintain the machine in its original state.

Check mark

All such operations performed on the alternator should be undertaken by personnel with training of electrical and mechanical components.

Check mark

Before any intervention on the machine, ensure that it cannot be started by a manual or automatic system and that you have understood the operating principles of the system.

Check mark

The bearings are greased for life: approximate life of the grease (depending on use) = 20,000 hours or 3 years.

Check mark

Monitor the temperature rise in the bearings

Check mark

Temperature rise in the bearings should not exceed 60°C above the ambient temperature.

Check mark

Should this value be exceeded, the machine must be stopped and checks carried out.

Check mark

Sign off on the alternator bearings replacement

Run this procedureArrow right

Voltage Regulator Adjustment

Check mark

Ensure all electric loads are disconnected, engine is stopped and main breaker is turned on.

Check mark

Voltage Selector Switch set to 277/480V position and VSS door closed and latched

Check mark

Voltage POT(P2) on regulator adjusted to full counterclockwise position

Check mark

Voltage POT on control panel adjusted to full clockwise position

Check mark

Start the unit

Check mark

Verify generator frequency

Check mark

Voltage Output Monitor switch on the control panel set to L1-L2 position

Check mark

Adjust Voltage POT(P2) on the regulator to read 500V on AC voltmeter

Check mark

Stability POT(P3) adjusted counter clockwise until the AC volts within ± 1 volt

Run this procedureArrow right

500 Hourly / 3 Monthly Air Cleaner Maintenance

Check mark

Proper maintenance of the air cleaner provides maximum protection against airborne dust.

Check mark

Squeeze the rubber valve (precleaner dirt dump periodically to ensure that it is not clogged).

Check mark

To service the air cleaners, proceed as follows:

Check mark

Remove filter element.

Check mark

Inspect air cleaner housing for any condition that might cause a leak and correct as necessary.

Check mark

Wipe inside of air cleaner housing with a clean, damp cloth to remove any dirt accumulation. This will permit better seal for gasket on filter element.

Check mark

Install element.

Check mark

The air cleaner assembly (housing) should be inspected every 3 months or 500 hours for any leakage paths.

Check mark

Make sure the inlet is free from obstruction.

Run this procedureArrow right

6 Monthly Engine Maintenance

Check mark

1. Fuel/Water Separator

Check mark

• Every six months or 500 hours, or less if fuel is of poor quality or contaminated, replace the bowl elements(s).

Check mark

2. Engine Radiator

Check mark

• The engine coolant system is normally filled with a 50/50 mixture of water and ethylene glycol.

Check mark

• This permanent type anti-freeze contains rust inhibitors and provides protection to -35°F (-37°C). The use of such a mixture is recommended for both summer and winter operation.

Check mark

• When using water alone, be sure to add a reputable brand of rust inhibitor to prevent internal corrosion.

Check mark

• It is recommended to test the freezing protection of the coolant every six months or prior to freezing temperatures. Replenish with a fresh mixture every twelve months.

Check mark

3. Check Control Compartment (Interior).

Check mark

4. Drain Fuel Tank.

Run this procedureArrow right

Parts for Doosan Generator G25WMI-2A-T2 (B54)

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Air Cleaner Element (Engine) Primary

35393685

Engine Oil Filter Element

85426856

Fuel Water Separator Element

54525530

Engine Fuel Element

85426823

250 Hour Maintenance Kit (without fluids)

44003945

Air Cleaner Element (Engine) Primary

35393685

Engine Oil Filter Element

85426856

Fuel Water Separator Element

54525530

Engine Fuel Element

85426823

250 Hour Maintenance Kit (without fluids)

44003945

Air Cleaner Element (Engine) Primary

35393685

Engine Oil Filter Element

85426856

Fuel Water Separator Element

54525530

Engine Fuel Element

85426823

250 Hour Maintenance Kit (without fluids)

44003945

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Doosan

Explore Other Assets