Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Air-Cooled Scroll Compressor Chiller AGZ150EDSEMVK0A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
High Ambient Control Panel Maintenance
Pre-maintenance checks
Is the unit operating at ambient temperatures of 105°F (40.6°C) and above?
Is the fan VFD (low ambient option) included?
Component Inspection
Verify the presence of all components
Inlet Filters Maintenance
Check inlet filters for cleanliness
Clean inlet filters if required
Fan Operation Verification
1 Yearly Refrigerator Testing
Compressor Vibration Test
Perform compressor vibration test
Oil Sample Testing
Conduct acid test on oil sample
Annual Operations
Include all weekly operations
Include all monthly operations
Additional Notes
Note that annual (or spring start-up) operations include all weekly and monthly operations
1 Yearly Condenser Check
Fan Inspection
Check fan blades for tightness on shaft
Check fans for loose rivets and cracks
Safety Precautions
Ensure fan motors are electrically locked out
Additional Operations
Include all weekly and monthly operations
1 Yearly Electrical System Maintenance
Safety Precautions
LOCKOUT/TAGOUT all power sources prior to starting, pressurizing, de-pressuring, or powering down the Chiller
Disconnect electrical power before servicing the equipment
Ensure the panel is de-energized by pulling the main unit disconnect
Verify more than one disconnect is used if necessary to de-energize the unit
Terminal and Control Panel Maintenance
Check terminals for tightness and tighten as necessary
Clean control panel interior
Equipment Testing and Calibration
1 Weekly Air-Cooled Scroll Compressor Chiller Inspection
Complete unit log and review
Check sight glasses for clear flow
Log readings
Is daily logging required for higher observation?
Access the parts list for your equipment in MaintainX.
Heat Recovery Unit Spring Isolator
332320119
Heat Recovery Unit RIS Isolator
332325113
Microchannel Fin Neoprene Pads
334549003
Microchannel Fin Spring Isolator
334548808
Heat Recovery Unit Spring Isolator
332320119
Heat Recovery Unit RIS Isolator
332325113
Microchannel Fin Neoprene Pads
334549003
Microchannel Fin Spring Isolator
334548808
Heat Recovery Unit Spring Isolator
332320119
Heat Recovery Unit RIS Isolator
332325113
Microchannel Fin Neoprene Pads
334549003
Microchannel Fin Spring Isolator
334548808
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX