Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Alfa Laval Spiral Heat Exchanger SHE LTL 30L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
SHE Shutdown Maintenance
SHUT-DOWN
Ensure proper circulation and shut-down procedures
Is the working fluid pipework system arranged for continuous venting?
Determine the action based on shut-down period and corrosion risk
Is the unit to be returned to the manufacturer for inspection, cleaning, or repair?
Drain, flush with water or proper cleaning agent, and redrain if returning to manufacturer
DRAINING
Ensure SHE is shut down and isolated from process and service streams before draining
Drain procedures based on SHE type
SHE Maintenance
Opening
Ensure safety before opening the unit
Disconnect the pipework
Disassemble hookbolts and remove covers
Dismantle flanged joint for cooling water outlet on Type IIIV
Check for damage when removing residual gasket material
Securely hold unit in place to prevent swinging
Securely fasten hinged covers at piping connections and mounting brackets
Testing
SHE Hydrostatic Testing
Testing
Ensure complete reassembly of the SHE before testing
Test one side of the unit before assembling the cover(s) on the other side, if desired
Ensure the face of the SHE body is held down by a rigid beam or other device during testing
Verify the beam is held down by the hookbolts with a weld bead
Confirm the hydrostatic pressure is one and one half (1 1/2) times the maximum allowable working pressure (MAWP)
Consult Alfa Laval if hydrostatic testing is not practical and air testing is considered
SHE Startup Check
Starting Up
Retighten hookbolt assemblies in a diagonally opposite sequence
Check recommended torque values in the reassembly section
Select the media to admit first to the SHE
Is it possible to admit the cooler media first?
Start pumps against closed valves
Ensure all pipework and the SHE are filled before opening valves fully
SHE Cleaning
CLEANING
Select the cleaning method used
Ensure pipework is provided with valved branches for cleaning agents circulation
Are the cleaning agents compatible with the materials of construction?
Use proprietary cleaning agents according to manufacturers' instructions
Provide specific cleaning instructions if available
Flush the unit completely of all cleaning agents
Is the unit drained if not put back into operation immediately?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.