

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Alfa Laval Spiral Heat Exchanger SHE Medium ISS/YSS
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Cover Gasket Maintenance
Reassembly
Verify cover placement and orientation
Check gasket specifications
Ensure gasket and cover compatibility
Apply hookbolts and finger-tighten
Tighten hookbolts diagonally using recommended torques
Enter the actual working pressure (psig)
Calculate and enter the torque based on actual working pressure
SHE Hydrostatic Testing
TESTING
Ensure all parts are in place before testing
Secure the exposed face of the SHE body with a rigid beam or device
Is the beam held down by the hookbolts with a weld bead?
Enter the maximum allowable working pressure (MAWP)
Enter the maximum test pressure (1.5 times MAWP)
Conduct hydrostatic test on one side of the unit
Is hydrostatic testing practical?
Consult Alfa Laval if air testing is considered
SHE Maintenance
Opening
Ensure the following before opening a Type I or III unit
Disconnect the pipework
Disassemble hookbolts and remove covers
Dismantle the flanged joint for the cooling water outlet on Type IIIV upper cover
Check for damage when removing residual gasket material
Securely hold the unit in place to prevent swinging
Securely fasten hinged covers at piping connections and mounting brackets before opening
Testing
SHE Shutdown Maintenance
SHUT-DOWN
Ensure proper shut-down sequence
Is the working fluid pipework system arranged for continuous venting?
Determine the action based on shut-down period and risk assessment
Is the unit to be returned to the manufacturer for inspection, cleaning, or repair?
Drain, flush with water or proper cleaning agent, and redrain if returning to manufacturer
DRAINING
Ensure SHE is shut down and isolated from process and service streams before draining
Drain the SHE based on type and orientation
SHE Startup Check
Starting Up
Retighten hookbolt assemblies in a diagonally opposite sequence
Is the cooler media admitted to the SHE first?
Is the fluid nearest ambient temperature admitted first if below ambient?
Were pumps started against closed valves?
Is the pipework and SHE filled before opening valves fully?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













