

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Alfa Laval Spiral Heat Exchanger SHE Cond 60L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
SHE Startup Check
STARTING UP
Retighten hookbolt assemblies in a diagonally opposite sequence
Is the cooler media admitted to the SHE first?
Is the fluid nearest ambient temperature admitted first if media are below ambient temperature?
Start pumps against closed valves
Are valves opened slowly to avoid hydraulic shock?
Is all pipework and the SHE filled before opening the valves fully?
SHE Shutdown Maintenance
SHUT-DOWN
Ensure proper circulation and shut-down procedures
Is the working fluid pipework system arranged for continuous venting?
Determine the action based on shut-down period and risk assessment
DRAINING
Ensure SHE is shut down and isolated from process and service streams before draining
Drain procedures based on SHE type
SHE Maintenance
Opening
Ensure unit safety before opening
Disconnect the pipework
Disassemble hookbolts and remove covers
Dismantle flanged joint for cooling water outlet on Type IIIV
Check for damage when removing gaskets
Secure unit to prevent swinging if mounted on trunnions
Fasten hinged covers at piping connections and mounting brackets before opening
Testing
SHE Cleaning
CLEANING
Select cleaning method
Ensure compatibility of cleaning agents with materials of construction
Use proprietary cleaning agents according to manufacturers' instructions
Flush the unit completely of all cleaning agents
Drain the unit if not put back into operation immediately
SHE Hydrostatic Testing
TESTING
Ensure all parts are in place before testing
Secure the exposed face of the SHE body with a rigid beam or device
Enter the hydrostatic pressure applied during the test
Is the test pressure within 1.5 times the MAWP?
Check for any distortion or damage to the SHE body after testing
Was air testing consulted with Alfa Laval if hydrostatic testing was not practical?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













