Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Alfa Laval Spiral Heat Exchanger SHE LTL 8S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
SHE Maintenance
Opening
Ensure the following before opening a Type I or III unit
Disconnect the pipework
Disassemble hookbolts and remove covers
Dismantle the flanged joint for the cooling water outlet on Type IIIV upper cover
Check for damage when removing residual gasket material
Securely hold the unit in place to prevent swinging
Securely fasten hinged covers at piping connections and mounting brackets before opening
Testing
SHE Cleaning
Cleaning Methods
Select the cleaning method used
Ensure pipework is provided with valved branches for cleaning agents circulation
Are the cleaning agents compatible with the materials of construction?
Specify the proprietary cleaning agents used and their manufacturers' instructions
Provide detailed information on the nature of the fouling/scaling and the serial number of the unit for specific cleaning instructions
Flush the unit completely of all cleaning agents
Is the unit drained if not put back into operation immediately?
SHE Startup Check
STARTING UP
Retighten hookbolt assemblies in a diagonally opposite sequence
Check recommended torque values in the reassembly section
Admit the cooler of the two media to the SHE first
Is the fluid nearest ambient temperature admitted first?
Start-up carried out smoothly and slowly
Start pumps against closed valves
Ensure all pipework and the SHE are filled before opening valves fully
SHE Channel Inspection
INSPECTION
Examine channels for the following issues
Is an optical device needed for inspection due to large channel width and small spacings?
Is there any massive corrosion or erosion evident?
Is there any mechanical damage suspected?
Describe any detected issues in detail
Contact Alfa Laval for advice regarding possible field repair if massive corrosion, erosion, or mechanical damage is evident or suspected.
SHE Shutdown Maintenance
SHUT-DOWN
Allow medium with inlet temperature nearest ambient to circulate after other medium is turned off
Reduce all flow rates slowly to avoid hydraulic and thermal shock
Ensure units with fluids having normal boiling point below ambient do not attain ambient temperature while containing fluid against closed valves
Arrange working fluid pipework system for continuous venting
Is the shut-down period short and the SHE not to be opened?
If leaving SHE full of stationary liquid involves risk for corrosion, perform the following
If risk for freezing exists or if the unit is to be opened, perform the following
If returning the unit to the manufacturer, perform the following
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX