

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Alfa Laval Spiral Heat Exchanger SHE LTL 8L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Cover Gasket Maintenance
Reassembly
Verify cover placement and orientation
Check gasket specifications
Ensure gasket and cover compatibility
Enter the recommended torque for hookbolts
Were hookbolts tightened diagonally?
Enter the actual working pressure
Calculate and enter the torque for actual working pressure
SHE Maintenance
Opening
Ensure unit safety before opening
Disconnect the pipework
Disassemble hookbolts and remove covers
Dismantle flanged joint for cooling water outlet on Type IIIV
Check for damage when removing gaskets
Secure unit to prevent swinging or tilting
Testing
Apply normal hydrostatic test procedures after reassembly
SHE Hydrostatic Testing
TESTING
Ensure the following conditions are met before testing
Is the face of the SHE body held down by a rigid beam or other device?
Enter the maximum allowable working pressure (MAWP)
Calculate and enter the maximum test pressure
Was the hydrostatic test performed successfully?
Was air testing considered due to impracticality of hydrostatic testing?
Consultation with Alfa Laval
SHE Startup Check
STARTING UP
Retighten hookbolt assemblies in a diagonally opposite sequence
Is the cooler media admitted to the SHE first?
Is the fluid nearest ambient temperature admitted first if media are below ambient temperature?
Start pumps against closed valves
Are valves opened slowly to avoid hydraulic shock?
Is all pipework and the SHE filled before opening valves fully?
SHE Channel Inspection
INSPECTION
Examine channels for the following issues
Is an optical device needed for inspection?
Is there any massive corrosion or erosion evident?
Is there any mechanical damage suspected?
Describe any detected issues in detail
Contact Alfa Laval for advice regarding possible field repair if necessary
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













