Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Untes Air Cooled Scroll Chiller THAETY–THAESY 4260
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
12 Monthly Heat Exchanger Inspection
Safety Precautions
Ensure all personnel are wearing suitable personal protective equipment (PPE)
Verify the area is clear of unauthorized personnel
Initial Inspection
Measure the pressure-drop between the inlet and outlet pipes using a differential pressure gauge
Compare the measured pressure-drop with the specified values in the annex
Cleaning Procedure
Prepare a tank with 5% phosphoric acid or 5% oxalic acid solution
Ensure the liquid detergent circulates around the exchanger at a flow rate at least 1.5 times higher than the rated working flow rate
Fan Grille Inspection
Safety Precautions
Ensure all fans are turned off before inspection
Do not remove the protective grilles under any circumstances
Inspection of Fan Grilles
Check that the fan grilles are clear of obstructions
Is there any visible damage to the fan grilles?
Post Inspection
Was the area around the fan cleaned after inspection?
Describe any issues found during inspection
Finned Coils Cleaning
Preparation
Ensure all personal protective equipment is worn
Inspect the area for any obstructions around the coils
Cleaning Process
Wash the coils with detergents and water
Brush the fins gently to avoid damage
Remove any foreign bodies from the condensing coils
Post-Cleaning Inspection
Is it possible to clean the coils completely?
6 Monthly Unit Check
Check power consumption of the unit
Check contactors on the electric panel
Inspect motors and fan blades for cleanliness and abnormal vibrations
Ensure motor cleanliness and absence of impurities
Check gas charge and humidity in circuit with unit running at full capacity
Ensure there are no gas leaks
Check the functioning of the maximum and minimum pressure switches
Bleed air from the chilled water system
6 Monthly Unit Inspection
General Cleaning
Clean the unit using a moist cloth
Unit Condition Inspection
Inspect the general conditions of the unit
Is there any corrosion on the unit framework?
Treat any detected corrosion with protective paint
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX