MaintainX Asset Hub logo
EnterprisePricing
Skyjack

Skyjack Telehandler SJ843 TH

Need answers fast?
Explore the manual using AI.

Skyjack Telehandler SJ843 TH
Skyjack Telehandler SJ843 TH

The Skyjack Telehandler SJ843 TH is a robust and versatile piece of industrial equipment designed for lifting and moving heavy loads on construction sites. Known for its reliability and ease of use, this telehandler is ideal for various applications, ensuring optimal performance and safety in demanding environments.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Skyjack Telehandler SJ843 TH

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Skyjack Telehandler SJ843 TH

Skyjack Telehandler SJ843 TH

Create an account to install this asset package.

Maintenance Plans for Skyjack Telehandler Model SJ843 TH

Integrate maintenance plans directly into your work orders in MaintainX.

1000 Hourly / 1 Yearly Axle Differential Oil Replacement

Check mark

WARNING! Hot oil or components can burn. Oil must be at normal operating temperature when draining. Avoid contact with hot oil or components. Do not allow oil to drain into the ground.

Check mark

Axle differential oil at normal operating temperature

Check mark

Machine parked on a firm level surface, parking brake applied, machine shut off, and allowed to sit for two minutes

Check mark

Container capable of holding approximately 10 quarts (9.5 litres) placed under axle drain plugs

Check mark

Areas around the three (3) drain plugs and level/fill plug cleaned

Check mark

Level/fill plug removed

Check mark

All three (3) drain plugs removed and oil drained from the differential

Check mark

Used oil disposed of in accordance with local regulations

Check mark

Magnetic drain plugs wiped off with a clean rag and installed in the axle

Run this procedureArrow right

1000 Hourly / 1 Yearly Axle Planetary Oil Replacement

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Axle assembly has planetary gear lubricant independent of the differential assemblies

Check mark

Axle planetary oil is at operating temperature

Check mark

Telehandler is parked on a firm level surface with the level/fill/drain plug at the 6 o’clock position

Check mark

Engine is shut down, parking brake is applied, and it has sat for a minimum of two minutes

Check mark

Area around the plug is clean and plug is removed

Check mark

Axle oil is drained into a container

Check mark

Magnetic drain plug is wiped off with a clean rag and installed in the planetary

Check mark

Plug is repositioned to the 3 o’clock or 9 o’clock position then removed again

Run this procedureArrow right

1000 Hourly / 1 Yearly Boom Chains Inspection

Check mark

Inspect for worn, cracked or broken plates

Check mark

Inspect for wear of plate and pin head

Check mark

Inspect for stiff links or enlarged plate holes

Check mark

Inspect for worn or rusted connecting pins

Check mark

Measure chain elongation. Measurement should be MAXIMUM of new chain length plus 3%

Check mark

If chain replacement is not necessary; clean the chain in solvent, and dry using low pressure compressed air

Check mark

Prior to installation, soak the chain in a pan of SAE 40 engine oil or chain and cable lubricant for a MINIMUM of 8 hours to ensure correct lubrication of the pins and links

Check mark

Sign off on the boom chains inspection

Run this procedureArrow right

1000 Hourly / 1 Yearly Engine Coolant Replacement

Check mark

WARNING! Always shut off the engine and allow it to cool down before removing the radiator cap. Steam or fluid escaping from the radiator may cause severe injury. Remove cap slowly to relieve pressure. Avoid contact with steam or escaping fluid

Check mark

NOTE! Machines with an enclosed cab have a heater unit that needs to be flushed separately

Check mark

NOTE! Place the heat select switch in the full hot position if equipped

Check mark

Open the radiator cap to ensure proper draining

Check mark

Place a container capable of holding 5 gallons (17 liters) under the radiator drain plug

Check mark

Open the drain plug and allow radiator and coolant bottle to drain

Check mark

Close the drain plug

Check mark

NOTE! For machines without an enclosed cab continue from step 10

Check mark

Close manual heater valve located near the radiator cap/surge tank then disconnect the heater hose connected to it

Run this procedureArrow right

1000 Hourly / 1 Yearly Hydraulic Oil Filter Replacement

Check mark

Is the telehandler on a firm level surface?

Check mark

Is the park brake applied and the engine shut down?

Check mark

Is the engine compartment cover unlatched and lifted up to gain access to Hydraulic Oil Filter?

Check mark

Is a suitable container placed under filter to catch any spilled oil?

Check mark

Is the old filter unscrewed and discarded? Are all traces of the old filter gasket removed from the filter head?

Check mark

Is a light coating of clean oil applied to the gasket on the new filter?

Check mark

Is the new filter installed and turned until the gasket contacts the filter head?

Check mark

Is the new filter tightened an additional 1/2 to 3/4 turn by hand to compress the gasket?

Check mark

Sign off on the hydraulic oil filter replacement

Run this procedureArrow right

Parts for Skyjack Telehandler SJ843 TH

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Accumulator, Diaphragm (If Equipped)

9-400947

Coil, #10

9-168057

Coil, #8

9-159821

Cylinder, Extend 115B

9-190045

Cylinder, Fork Tilt 120B

9-190043

Accumulator, Diaphragm (If Equipped)

9-400947

Coil, #10

9-168057

Coil, #8

9-159821

Cylinder, Extend 115B

9-190045

Cylinder, Fork Tilt 120B

9-190043

Accumulator, Diaphragm (If Equipped)

9-400947

Coil, #10

9-168057

Coil, #8

9-159821

Cylinder, Extend 115B

9-190045

Cylinder, Fork Tilt 120B

9-190043

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Skyjack

Explore Other Assets