

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Scotsman Modular Cuber C0722
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Spillway Scrubbing
Preparation
Shut machine off
Remove right side panel liner and panel
Ice Thickness Sensor Handling
Disconnect ice thickness sensor from its bracket and move out of the way
Scrubbing Procedure
Perform 4 to 6 strokes across the normal flow of water using a clean nylon scrubbing pad
Reassembly and Testing
Reassemble all components
Harvest Assist and Hot Gas Valve Testing
Harvest Assist Testing
Push and release the Harvest button to activate the Hot Gas indicator light.
Did the ejection pin extend when the ice was thin or after pressing against nearly full-sized ice?
Perform a voltage check on the harvest assist solenoid harness connector.
Is there full voltage at the connector?
Is there voltage from pin 5 to ground at the controller?
Describe any issues found with the solenoid or motor.
Hot Gas or Vapor Valve Testing
Ensure the unit is running or has been off for more than 4 minutes.
Liquid Line Solenoid Testing
Preparation
Ensure the model is a remote model
Put the controller into test mode by depressing Off for 3 seconds then Clean for 3 seconds
Test Cycle Verification
Is the Condenser Fan motor indicator light on at the end of the test cycle?
Is the liquid line valve open at the end of the test cycle?
Voltage Check
Is there full voltage at the liquid line lead connection at the end of the test?
Is there voltage from the liquid line solenoid lead (top wire) to ground when the Condenser Fan indicator light is On?
Purge Valve Testing
Initial Testing with Indicator Lights
Shut unit off by holding the Off button for 3 seconds
Wait for four minutes
Push and release the On button
Is the Purge Valve indicator light ON?
Voltage Check if Purge Valve Does Not Open
Shut the unit down by holding the Off button for 3 seconds
Unplug the harness connection from the purge valve
Wait for four minutes
Ice Thickness Sensor Testing
Indicator Light Test
Observe the Ready To Harvest light
Shut the machine off
Connect the metal part of the Ice Thickness sensor to the evaporator or touch its metal surface to the metal control box wall
Did the Ready for Harvest light turn ON?
Ohmmeter Test
Disconnect electrical power
Open the control box cover
Unplug the ice thickness sensor lead from the controller
Access the parts list for your equipment in MaintainX.
Pre-Charged Tubing Kit, 10 Ft
RTE10
Pre-Charged Tubing Kit, 25 Ft
RTE25
Pre-Charged Tubing Kit, 40 Ft
RTE40
Pre-Charged Tubing Kit, 75 Ft
RTE75
Fan Motor Relay Kit (For Dual ERC211 Remote Condenser)
KCMR120
Pre-Charged Tubing Kit, 10 Ft
RTE10
Pre-Charged Tubing Kit, 25 Ft
RTE25
Pre-Charged Tubing Kit, 40 Ft
RTE40
Pre-Charged Tubing Kit, 75 Ft
RTE75
Fan Motor Relay Kit (For Dual ERC211 Remote Condenser)
KCMR120
Pre-Charged Tubing Kit, 10 Ft
RTE10
Pre-Charged Tubing Kit, 25 Ft
RTE25
Pre-Charged Tubing Kit, 40 Ft
RTE40
Pre-Charged Tubing Kit, 75 Ft
RTE75
Fan Motor Relay Kit (For Dual ERC211 Remote Condenser)
KCMR120
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













