

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Schneider Electric Circuit Breaker MTZ1-800-L1
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Micrologic X Ready LED Status Check
Power the Micrologic X control unit
Check the Micrologic X Ready LED status
Refer to chapter Critical Cases if the Ready LED is not flashing green
Echoreach Software Tripping Mechanism Testing
Close the circuit breaker
Use a thin screwdriver to briefly push in (<1 s) the test button on the control unit
Check that the circuit breaker is open
Check that the blue fault-trip reset button has popped out
Check that the Ig/IΔn LED is on
Check that the SDE contacts have switched
Reset the circuit breaker after the test
Circuit Breaker Visual Inspection
Record equipment identification
Check that the device is undamaged, correctly mounted, and securely fastened in the switchboard
Check the 3-phase clearance at terminal blocks
Check for debris at the back of the device housing/enclosure
Check ground terminals connection
Check that all external surfaces are undamaged
Rectify any non-conformities, if possible
Refer all equipment non-conformities to asset management
Communication Network Testing
Setup and Connection
Connect a PC running Ecoreach software using an RJ45 cable to the communication network.
Device Selection and Testing
In Ecoreach software, navigate to Create report → Communication test & report.
Select devices to be tested from the list of communicating devices defined in the project.
Click Run test to test all selected devices.
Results and Reporting
Were the results displayed at the end of the test?
Generate the communication test report with Ecoreach software.
Electrical Continuity Check
Close the device
Check electrical continuity for each phase
For fixed device: Check continuity on the power terminals
For drawout device: Check continuity on the chassis power terminals with the device in the connected position
Record any issues found during the continuity check
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













