MaintainX Asset Hub logo
EnterprisePricing
Sechrist Industries

Sechrist Industries Monoplace Hyperbaric Chamber 3600E

Need answers fast?
Explore the manual using AI.

Sechrist Industries Monoplace Hyperbaric Chamber 3600E
Sechrist Industries Monoplace Hyperbaric Chamber 3600E

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Sechrist Industries Monoplace Hyperbaric Chamber 3600E

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Sechrist Industries Monoplace Hyperbaric Chamber 3600E

Sechrist Industries Monoplace Hyperbaric Chamber 3600E

Create an account to install this asset package.

Maintenance Plans for Sechrist Industries Monoplace Hyperbaric Chamber Model 3600E

Integrate maintenance plans directly into your work orders in MaintainX.

Intercommunication System Inspection

Check mark

Initial Setup

Check mark

Connect the DC power supply and the auxiliary source to the Chamber.

Check mark

Turn on the auxiliary source.

Check mark

Power Supply and Control Panel Check

Check mark

Check the Power Supply and connections

Check mark

Is the DC Power Indicator illuminated?

Check mark

Is the Low Battery Indicator not illuminated?

Check mark

Control Panel Speaker and Volume Check

Check mark

Turn the Master Control Knob to the On position.

Run this procedureArrow right

Acrylic Cylinder Cleaning

Check mark

Safety Precautions

Check mark

Avoid abrasion of the polished Acrylic Cylinder during cleaning.

Check mark

Use only a damp pure cotton or linen cloth to remove dust.

Check mark

Never allow liquids or solvents to contact the Acrylic Cylinder.

Check mark

Avoid using any oil or alcohol based substances on the Acrylic Cylinder.

Check mark

Dust Removal

Check mark

Wipe the Cylinder with a soft, 100% cotton, lint free, water moistened cloth.

Check mark

General Cleaning

Check mark

Wash the Cylinder with a soft, 100% cotton, lint free cloth moistened with a mild detergent solution.

Run this procedureArrow right

6 Monthly Rate Set Inspection

Check mark

Turn the Master Control Knob to the On position

Check mark

Adjust the Compression Purge Flow Rate to 300 lpm

Check mark

Adjust the Rate Set display to 1 psig/min

Check mark

Adjust the Pressure Set digital display to 30.0 psig (3.04 ATA, 0.207 MPa, 206.9 kPa) by turning the Pressure Set Knob clockwise

Check mark

Record the amount of time required for the pressure to increase from 5.0 to 6.0 psig, 14.0 to 15.0 psig, and 25.0 to 26.0 psig

Check mark

Is the time period for pressure increase 60 seconds (± 10 seconds)?

Check mark

Contact SECHRIST INDUSTRIES if the rate of compression does not meet the required specifications

Check mark

Adjust the Pressure Set to the idle 1.5 psig by turning the Pressure Set Knob counter-clockwise

Check mark

Record the amount of time required for the pressure to decrease from 26.0 to 25.0 psig, 15.0 to 14.0 psig, and 6.0 to 5.0 psig

Run this procedureArrow right

Chamber Maintenance

Check mark

Disinfection Process

Check mark

Disinfect the Chamber according to the type of cases being treated and as directed by the medical staff.

Check mark

Wash the Chamber and all surfaces

Check mark

Use approved disinfectant or mild dish washing soap for cleaning surfaces

Check mark

Viewport Window Cleaning

Check mark

Use only Sechrist Industries qualified disinfectants for the acrylic Viewport window

Run this procedureArrow right

1 Yearly Chamber Preventive Maintenance

Check mark

General Guidelines

Check mark

Ensure maintenance is performed within 9 to 15 months of service

Check mark

Verify that all maintenance personnel are aware of the importance of keeping filters and mechanisms clean

Check mark

Gas Supply Inspection

Check mark

Inspect gas supply for contamination

Check mark

Is the gas supply free from hydrocarbons?

Check mark

Filter and Mechanism Maintenance

Check mark

Check and clean the following components

Check mark

Ensure all filters are free from hydrocarbons

Run this procedureArrow right

Parts for Sechrist Industries Monoplace Hyperbaric Chamber 3600E

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Medical Grade Power Supply

40018

IV Pass-Thru Assembly

HB703

19-Pin Cable Assembly

22156

19-Pin Cable Assembly

22157

Power Supply Unit Plus the DC Cord.

22218

Medical Grade Power Supply

40018

IV Pass-Thru Assembly

HB703

19-Pin Cable Assembly

22156

19-Pin Cable Assembly

22157

Power Supply Unit Plus the DC Cord.

22218

Medical Grade Power Supply

40018

IV Pass-Thru Assembly

HB703

19-Pin Cable Assembly

22156

19-Pin Cable Assembly

22157

Power Supply Unit Plus the DC Cord.

22218

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Sechrist Industries

Explore Other Assets