

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Schneider Electric Circuit Breaker MTZ1-1250-H3
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Remote Control Testing
Setup Connection
Connect PC running Ecoreach software using RJ45 cable to communication network
Select interface for connection
Is the control mode set to Auto: Remote?
Ecoreach Software Configuration
Select the circuit breaker in Ecoreach software
Connect to the circuit breaker
Device Operation
Access the Open and Close buttons via the Device tab
High-Voltage Insulation Check
Safety Precautions
CAUTION!
Disconnect the VPS module by pulling it out to the disconnected position before running a dielectric test on the equipment.
Unplug any cables from the mini USB port on the front face of the Micrologic X control unit.
Acknowledge understanding of potential injury or equipment damage if instructions are not followed.
Device Preparation
Close the Masterpact MTZ device.
Insulation Resistance Measurement
Measure the insulation resistance using a 500 Vdc insulation resistance tester between one of the phases and the other two phases grounded. Repeat for each phase.
Electrical Continuity Check
Close the device
Check electrical continuity for each phase
Check continuity on the power terminals for fixed device
Check continuity on the chassis power terminals for drawout device in connected position
Firmware Compatibility Check
Connection Setup
Connect a PC running Ecoreach software to the Micrologic X control unit using a mini USB cable
Establish a connection with the control unit
Firmware Status Check
Use the Overall System firmware status/compatibility matrix on Ecoreach
Display firmware information
System Compatibility Actions
Describe the recommended actions taken to achieve compatibility
Completion
Micrologic X Ready LED Status Check
Power the Micrologic X control unit
Check the Micrologic X Ready LED status
Refer to chapter Critical Cases if the Ready LED is not flashing green
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













