

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

QubicaAMF Worldwide Bowling Pinspotter Edge String
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Table Pulley Replacement
Precautions
Ensure all precautions are in place
Tools Required
Gather necessary tools
Replacement Procedure
Implement LOTO and deploy lane barriers
Insert screwdriver into small hole on side of pin and push string knot out through large hole on side of pin
Untie knot and remove pin and sleeve from string
Pull string up and out of table pulley
Drawbar Gearmotor Replacement
Precautions
Ensure all precautions are in place
Tools Required
Ensure all tools are available
Procedure Steps
Implement LOTO and deploy lane barriers
Disconnect drawbar motor plugs from machine control box
Cut all cable ties holding motor cable to machine
Remove bolts (2) from gearmotor mounting plate. Support gearmotor as needed
Chain Lift Replacement
Precautions and Tools
Ensure all precautions are in place
Gather necessary tools
Initial Setup
Implement LOTO and deploy lane barriers
Guard and Component Removal
Remove pit rear guards (both pits) and double division guard
Remove ball rails, ball stop, and support bracket
Remove system controller guard
Drawbar Replacement
Precautions
Ensure all safety precautions are in place
Tools and Equipment
Gather necessary tools
Preparation
Press PINS UP before LOTO
Implement LOTO and deploy lane barriers
String and Panel Removal
Unwind all strings from reel arm spools
Drawbar Chain Lubrication
Precautions
Ensure all precautions are in place
Tools Required
Ensure all tools are available
Location and Time
Confirm location is Pindeck, Front of Machine
Estimated time for procedure (minutes)
Procedure Steps
Implement LOTO and deploy lane barriers
Access the parts list for your equipment in MaintainX.
Side Frame Sprt Plate Cmn
051-200-079
Screw, Fhpts 12 X 1.25 Zn Ty17
829-642-202
Asm, Kickback, Common
051-200-220
Screw, Hhms $/16-18 X 1.25 Bp Sems Dp
817-157-201
Screw, Fhpws 16 X 5.00 Zn
814-852-802
Side Frame Sprt Plate Cmn
051-200-079
Screw, Fhpts 12 X 1.25 Zn Ty17
829-642-202
Asm, Kickback, Common
051-200-220
Screw, Hhms $/16-18 X 1.25 Bp Sems Dp
817-157-201
Screw, Fhpws 16 X 5.00 Zn
814-852-802
Side Frame Sprt Plate Cmn
051-200-079
Screw, Fhpts 12 X 1.25 Zn Ty17
829-642-202
Asm, Kickback, Common
051-200-220
Screw, Hhms $/16-18 X 1.25 Bp Sems Dp
817-157-201
Screw, Fhpws 16 X 5.00 Zn
814-852-802
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













