

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Powrmatic Air Heater NV60-D
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Main Fan Assembly Maintenance
7.5.1 NV/F Models
Inspect the fan blades for damage and excessive deposits
Is it necessary to remove the assembly for cleaning?
If removal is necessary
Slacken the cable gland on the heater casing
Disconnect the fan leads from the electrical terminals on the PCB
Withdraw cable through entry grommet
Remove the fan and motor assembly by removing the four hexagon headed bolts
Reassemble in reverse order
Electrode Assemblies Replacement
Disconnection and Removal
Disconnect the electrode leads from the PCB terminal
Remove the screw securing the electrode assembly to the burner assembly side plate
Withdraw the electrode assembly
Replacement and Reassembly
Fit the replacement electrode assembly
Reassemble in reverse order
Final Checks
Check the spark gap is 2.5 mm
Air Pressure Switch Replacement
Preparation
Disconnect electrical connections
Removal of Old Pressure Switch
Pull off the sensing tube from the air pressure switch
Note the setting of the old pressure switch
Remove the screws fixing the air pressure switch
Remove the old pressure switch
Installation of New Pressure Switch
Fit replacement pressure switch in reverse order
Multifunctional Control Replacement
Remove the burner assembly as previously described in Section 7.2
Release the flanged connections at the inlet and outlet of the multifunctional control
Remove the multifunctional control
Reconnect the new valve ensuring correct orientation
Renew the sealing O-rings if necessary
Printed Circuit Board (PCB)
Preparation
Disconnect all electrical connections
PCB Removal
Release the PCB from mounting posts
Remove the PCB from its mounting posts
PCB Replacement
Fit replacement PCB in reverse order
Access the parts list for your equipment in MaintainX.
MFC - Honeywell VR4605AB1027
145035204
MFC - Honeywell VR425AB1007
141378715
Ignition Electrode (10–75)
142423002
Rectification Electrode
142423003
Burner - Bray P51 AB 19001 (10–75)
142400240
MFC - Honeywell VR4605AB1027
145035204
MFC - Honeywell VR425AB1007
141378715
Ignition Electrode (10–75)
142423002
Rectification Electrode
142423003
Burner - Bray P51 AB 19001 (10–75)
142400240
MFC - Honeywell VR4605AB1027
145035204
MFC - Honeywell VR425AB1007
141378715
Ignition Electrode (10–75)
142423002
Rectification Electrode
142423003
Burner - Bray P51 AB 19001 (10–75)
142400240
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













