

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Pitco Full And Split Gas Fryer MG2T
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Computer Removal
Removing Nuts
Remove two #10-24 nuts securing top of computer to bezel studs
Loosen two #10-24 nuts securing bottom of computer to bezel studs
Remove computer from bezel
Post Removal Check
Check for any damage to the computer or bezel
Ensure all tools are accounted for
Pump Box Removal
Preparation
Is the pump removal necessary for split tank fryers?
Pump Box Removal Steps
Disconnect all electrical connections to pump box.
Remove screws securing pump box to cabinet bottom brace using a 5/16” hex bit.
Slide pump box back and out of cabinet.
Probe Replacement
Preparation
Completely drain fry tank into a suitable container
Disconnection
Disconnect probe electrical plug, P7, from jack, J7, located above ignition module
Removal of Old Probe
Remove 2 screws securing probe bulb clamp inside tank using Phillips screwdriver. Remove bulb clamp
Straighten probe by bending it upwards
Loosen Ferrule Nut on probe fitting underneath tank, using 7/16” wrench
Unscrew fitting from bottom of tank using 9/16” wrench
High Limit Replacement
Draining the Fry Tank
Completely drain fry tank into a suitable container
Removing the High Limit Switch
Remove 2 screws securing high limit switch to burner bracket using 5/16” hex bit
Unplug high limit electrical plug, P5, from jack, J5, above ignition module
Removing the Capillary and Bulb
Unscrew capillary ferrule nut using 5/16” open-end wrench
Remove 2 screws securing bulb clamp to tank tapping pad using Phillips screwdriver
Remove bulb clamp
Hood Relay Removal
Remove Cord Entrance Box
Remove Hood Relay from Box
Disconnect wires from relay
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













