MaintainX, an Autodesk company
EnterprisePricing
Pitco

Pitco Full And Split Gas Fryer MG2T

Need answers fast?
Explore the manual using AI.

Pitco Full And Split Gas Fryer MG2T
Pitco Full And Split Gas Fryer MG2T

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Pitco Full And Split Gas Fryer MG2T

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Pitco Full And Split Gas Fryer MG2T

Pitco Full And Split Gas Fryer MG2T

Create an account to install this asset package.

Maintenance Plans for Pitco Full And Split Gas Fryer Model MG2T

Integrate maintenance plans directly into your work orders in MaintainX.

Computer Removal

Check mark

Removing Nuts

Check mark

Remove two #10-24 nuts securing top of computer to bezel studs

Check mark

Loosen two #10-24 nuts securing bottom of computer to bezel studs

Check mark

Remove computer from bezel

Check mark

Post Removal Check

Check mark

Check for any damage to the computer or bezel

Check mark

Ensure all tools are accounted for

Run this procedureArrow right

Pump Box Removal

Check mark

Preparation

Check mark

Is the pump removal necessary for split tank fryers?

Check mark

Pump Box Removal Steps

Check mark

Disconnect all electrical connections to pump box.

Check mark

Remove screws securing pump box to cabinet bottom brace using a 5/16” hex bit.

Check mark

Slide pump box back and out of cabinet.

Run this procedureArrow right

Probe Replacement

Check mark

Preparation

Check mark

Completely drain fry tank into a suitable container

Check mark

Disconnection

Check mark

Disconnect probe electrical plug, P7, from jack, J7, located above ignition module

Check mark

Removal of Old Probe

Check mark

Remove 2 screws securing probe bulb clamp inside tank using Phillips screwdriver. Remove bulb clamp

Check mark

Straighten probe by bending it upwards

Check mark

Loosen Ferrule Nut on probe fitting underneath tank, using 7/16” wrench

Check mark

Unscrew fitting from bottom of tank using 9/16” wrench

Run this procedureArrow right

High Limit Replacement

Check mark

Draining the Fry Tank

Check mark

Completely drain fry tank into a suitable container

Check mark

Removing the High Limit Switch

Check mark

Remove 2 screws securing high limit switch to burner bracket using 5/16” hex bit

Check mark

Unplug high limit electrical plug, P5, from jack, J5, above ignition module

Check mark

Removing the Capillary and Bulb

Check mark

Unscrew capillary ferrule nut using 5/16” open-end wrench

Check mark

Remove 2 screws securing bulb clamp to tank tapping pad using Phillips screwdriver

Check mark

Remove bulb clamp

Run this procedureArrow right

Hood Relay Removal

Check mark

Remove Cord Entrance Box

Check mark

Remove Hood Relay from Box

Check mark

Disconnect wires from relay

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Pitco

Explore Other Assets