MaintainX, an Autodesk company
EnterprisePricing
FRISTAM

FRISTAM Positive Displacement Pump FDS-3

Need answers fast?
Explore the manual using AI.

FRISTAM Positive Displacement Pump FDS-3
FRISTAM Positive Displacement Pump FDS-3

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for FRISTAM Positive Displacement Pump FDS-3

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

FRISTAM Positive Displacement Pump FDS-3

FRISTAM Positive Displacement Pump FDS-3

Create an account to install this asset package.

Maintenance Plans for FRISTAM Positive Displacement Pump Model FDS-3

Integrate maintenance plans directly into your work orders in MaintainX.

Screw Removal

Check mark

Preparation

Check mark

Place a brass or aluminum block between the screws to block rotation

Check mark

Screw Nut Removal

Check mark

Remove the screw nut from the drive screw

Check mark

Move the block to the underside, near the housing, to torque the opposite screw

Check mark

Remove the screw nut from the idle screw

Check mark

Inspection

Check mark

Inspect the screw nut gaskets for damage

Check mark

Screw Removal

Run this procedureArrow right

4000 Hourly Oil Change

Check mark

Preparation

Check mark

Ensure the machine is turned off and cooled down

Check mark

Gather necessary tools and materials (ISO 100 synthetic oil, wrench, oil pan)

Check mark

Oil Change Process

Check mark

Record the current operating hours of the machine

Check mark

Is the machine operating under severe conditions?

Check mark

Drain the old oil

Check mark

Replace the oil

Check mark

Post-Change Verification

Run this procedureArrow right

Casing Removal

Check mark

Casing Removal Process

Check mark

Loosen the casing/housing bolts

Check mark

Remove the casing from the housing using a rubber mallet if necessary

Check mark

Inspect the casing/housing gasket for damage

Run this procedureArrow right

Cover Removal

Check mark

Cover Removal Process

Check mark

Remove the cover bolts and washers

Check mark

Remove the cover from the casing

Check mark

Did you use a rubber mallet to tap the cover off the casing dowel pins?

Check mark

Gasket Inspection

Check mark

Remove the cover gasket

Check mark

Inspect the cover gasket for damage

Run this procedureArrow right

Seal Replacement

Check mark

Mechanical Seal Removal

Check mark

Loosen the four mechanical seal retainer bolts

Check mark

Remove the mechanical seal retainers

Check mark

Remove the rotating units from the shafts

Check mark

Remove the stationary units from the housing

Check mark

Inspect as necessary

Check mark

Mechanical Seal Installation

Check mark

Lubricate the outer O-ring of the stationary seal

Check mark

Line up the notch to the outside of the housing

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from FRISTAM

Explore Other Assets