

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Loren Cook Company Ventilation Fan CPS 120
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 1 Month Fan Inspection
Maintenance
Establish a schedule for inspecting all parts of the fan
Determine the frequency of inspection based on operating conditions and location of the fan
Inspect fans exhausting corrosive or contaminated air within the first month of operation
3 Yearly Motor Bearing Lubrication
Motor Bearings
Are the motor bearings operating under severe conditions?
Disassemble the motor bearings for inspection and lubrication if necessary.
Lubricate the motor bearings.
Reassemble the motor bearings after lubrication.
Describe any issues found during the inspection.
Initial Fan Startup Check
Wheel Rotation
Test the fan to ensure the rotation of the wheel is the same as indicated by the arrow marked Rotation
Final Installation Steps
Inspect fasteners and setscrews, particularly fan mounting and bearing fasteners, and tighten according to the table, Recommended Torque for Setscrews/Bolts
Inspect for correct voltage with voltmeter
Ensure all accessories are installed
Pre-Start Checks
Lock out all the primary and secondary power sources
Ensure fasteners and setscrews, particularly those used for mounting the fan, are tightened
200 Hourly Fan Bearing Lubrication
Lubrication — Fan Bearings
Check shaft size and operation hours
Is the fan operating under extreme conditions (dirty/wet/rough)?
Is the fan operating at higher temperatures above 120°F?
Is the fan shaft vertical?
Clean the grease nipple and immediate vicinity thoroughly without high pressure equipment
Is the fan in operation during lubrication?
Pump grease slowly until a slight bead forms around the bearing seals
Avoid excessive pressure to prevent seal damage
Fan Speed Calibration
Changing Shaft Speed
Ensure all belt driven fans with motors up to and including 5HP are equipped with variable pitch pulleys
Loosen setscrew on driver (motor) pulley and remove key, if equipped
Turn the pulley rim to open or close the groove facing
If the pulley has multiple grooves, ensure all are adjusted to the same width
Inspect for proper belt tension after adjustment
Select the desired speed adjustment
Ensure RPM limits of the fan and horsepower limits of the motor are maintained
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













