Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mitsubishi Branch Box PAC-MKA31BC
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
LEV Assembly Replacement
Upload Photo 1
Controller cover removed
Under panel removed
Upload Photo 2-1
Insulations and pipe box fixing screws removed
LEV and thermistor connectors disconnected
Lead wires pulled out to the pipe box side
Upload Photo 3
Band cut and rubber mount removed
Thermistor Replacement
Upload Photo 1 of the controller cover and under panel removal
Upload Photo 2-1 of the insulation and pipe box removal
Thermistors TH-A to E removed from sensor holders?
Upload Photo 2-2 of the thermistor removal
Insulation sheet bundling the thermistor connectors loosened?
Side clamps loosened and connectors on the controller board disconnected?
Lead wires pulled out through the hole to the controller board side?
Upload Photo 2-3 of the lead wires
Note: Attach the insulation sheet to the thermistors and the lead wires of LEV coil after replacing thermistors.
LEV Coil Replacement
Upload a photo of the controller cover before removal
Controller cover removed
Upload a photo of the under cover before removal
Under cover removed
Number of insulations removed
Number of pipe cover fixing screws removed
Upload a photo of the bands before cutting
Bands cut and LEV coil(s) pulled out
Insulation sheet loosened
Controller Board Replacement
Warning: Ensure the machine is powered off before starting the procedure
Upload Photo 1 of the controller cover
Controller cover removed
Side clamps loosened and connectors disconnected
Upload Photo 4 of the controller board
Controller board pulled forward
Controller board removed from the holder
Sign off on the controller board replacement
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX