

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mitsubishi Branch Box PAC-MKA51BC
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
LEV Assembly Replacement
Upload Photo 1
Controller cover removed
Under panel removed
Upload Photo 2-1
Insulations and pipe box fixing screws removed
LEV and thermistor connectors disconnected
Lead wires pulled out to the pipe box side
Upload Photo 3
Band cut and rubber mount removed
Thermistor Replacement
Upload Photo 1 of the controller cover and under panel removal
Upload Photo 2-1 of the insulation and pipe box removal
Upload Photo 2-2 of the thermistor removal from sensor holders
Upload Photo of the loosened insulation sheet
Upload Photo of the disconnected connector(s) on the controller board
Upload Photo 2-3 of the lead wire(s) pulled out to the controller board side
Note: Attach the insulation sheet to the thermistor(s) and the lead wire(s) of LEV coil after replacing thermistor(s).
Note: Install the pipe box not to twine the lead wire(s) and the pipe cover around the pipe box.
Sign off on the thermistor replacement
LEV Coil Replacement
Upload Photo 1 of the controller cover and under cover removal
Upload Photo 2-1 of the insulation and pipe cover fixing screws removal
Upload Photo 3 of the LEV coil removal
Insulation sheet which bundles the LEV lead wires loosened
Side clamps loosened and connector(s) on the controller board disconnected
Upload Photo 2-2 or 2-3 of the lead wire(s) pulled out to the pipe box side
Note: Attach the insulation sheet to the thermistor(s) and the lead wire(s) of LEV coil after replacing thermistor(s).
Note: Install the pipe box not to twine the lead wire(s) and the pipe cover around the pipe box.
Sign off on the LEV Coil Replacement
Controller Board Replacement
Remove the controller cover
Upload a photo of the controller cover removed
Loosen the side clamps, then disconnect the connectors on the controller board
Pick an upper edge of the controller board, then pull forward
Upload a photo of the controller board detached
Remove the controller board from the controller board holder
Sign off on the controller board replacement
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













